Solution Manual For To Accompany: Estimating In Building Construction Tenth Edition
Steven J. Peterson Professor Emeritus Weber State University
Frank R. Dagostino (deceased)
ii Copyright © 2024, 2017, 2010 Pearson Education, Inc. All Rights Reserved.
Table of Contents Welcome
iv
New to the 10th Edition
v
Outcomes
vii
Instructor Resources
ix
Chapter 1—Introduction to Estimating
1
Chapter 2—Contracts, Bonds, and Insurance
6
Chapter 3—Project Manual
11
Chapter 4—The Estimate
15
Chapter 5—Computers in Estimating
19
Chapter 6—Overhead and Contingencies
22
Chapter 7—Labor
25
Chapter 8—Equipment
39
Chapter 9—Specialty Contractors
46
Chapter 10—Excavation
48
Chapter 11—Concrete
78
Chapter 12—Masonry
106
Chapter 13—Metals
118
Chapter 14—Wood
124
Chapter 15—Thermal and Moisture Protection
151
Chapter 16—Doors and Windows
166
Chapter 17—Finishes
172
Chapter 18—Electrical
196
Chapter 19—Plumbing
201
Chapter 20—Heating, Ventilating, and Air Conditioning
207
Chapter 21—Profit
212
Chapter 22—Other Estimating Methods
215
Appendix F—BidSim
222
iii Copyright © 2024, 2017, 2010 Pearson Education, Inc. All Rights Reserved.
New to the 10th Edition This edition has been extensively edited to improve its readability. The general outline of the book remains the same, and much of the information remains unchanged; however, most of the paragraphs have been rewritten to improve the flow and make it a faster, easier read for students. Hopefully, this will make reading this book a more enjoyable experience. The following is a summary of the fundamental changes that have been made to this edition: General
Learning outcomes have been added to each chapter.
Chapter 4
Rewrote Section 4-14 Errors and Omissions.
Chapter 5
Updated Section 5-6 Building Information Modeling to Autodesk Revit® 2023.
Added Section 5-7 Software Selection.
Chapter 6
Updated Example 6-1 so that the allocation of home office costs is now based on construction costs rather than revenues, allowing it to be used as a markup to the bid. In the previous edition, the allocation of the home office costs was calculated as a percentage of revenues, which required iteration to determine the home office costs to allocate a project. Every time the home office costs were added, the revenues increased, decreasing the home office costs as a percentage of the bid. By using the construction costs, this percentage can be added to the construction costs without iteration. The relationship between these two is as follows:
Percentage of revenues Markup 1 Percentage of revenues
Rewrote Section 6-4 Scheduling.
Chapter 7
Updated the payroll taxes in Section 7-6 Labor Burden.
Chapter 10
Rewrote the cross-section method in Section 10-6 Earthwork—New Site Grades and Rough Grade.
Chapter 12
Updated the standard sizes of bricks in Figure 12.11. Figures 12.6 and 12.13, Example 12-2, and Problems 17 and 18 have been updated to reflect this change. iv Copyright © 2024, 2017, 2010 Pearson Education, Inc. All Rights Reserved.
Chapter 14
Updated the stud length to 92 5 / 8 inches in Examples 14-11 to 14-14 to reflect current practices.
Added an example, Example 14-24, covering the estimating of lookouts.
Updated Figures 14.9 and 14.29 to be consistent with Figure 14.16.
Chapter 15
Updated Figure 15.8 to be consistent with Figure 14.16.
Chapter 17
Updated Examples 17-3, 17-4, 17-7, and 17-8 to include the revisions from Figure 14.9.
Updated Figure 17.12 to be consistent with Figure 14.16.
Chapter 18
Added two figures to Chapter 18.
Chapter 19
Added two figures to Chapter 19.
Appendices
Redrew the drawings in Appendices A, B, C, and D and the associated figures throughout the book to improve clarity and correct drawing errors. This change affects the solutions to the related examples and practice problems in Chapters 11 through 17.
Revised many of these files in Appendix J to enhance their functionality and correct errors.
v Copyright © 2024, 2017, 2010 Pearson Education, Inc. All Rights Reserved.