Solution Manual for Matching Supply with Demand An Introduction to Operations Management, 5th Edition Cachon Chapter 2-19 Chapter 2 The Process View of the Organization Q2.1 Dell The following steps refer directly to Exhibit 2.1. #1: For 2001, we find in Dell’s 10-k: Inventory = $400 (in million) #2: For 2001, we find in Dell’s 10-k: COGS = $26,442 (in million) 26,442$ / year #3: Inventory turns 66.105 turns per year 400$ 40% per year #4: Per unit Inventory cost 0.605% per year 66.105 per year Q2.2. Airline We use Little’s law to compute the flow time, since we know both the flow rate as well as the inventory level: Flow Time Inventory / Flow Rate 35 passengers / 255 passengers per hour 0.137 hours 8.24 minutes Q2.3 Inventory Cost (a) Sales $60,000,000 per year / $2000 per unit 30,000 units sold per year Inventory $20,000,000/ $1000 per unit 20,000 units in inventory Flow Time Inventory / Flow Rate 20,000/ 30,000 per year 2/ 3 year 8 months Turns 1/ Flow Time 1/ (2/ 3 year) 1.5 turns per year
Note: we can also get this number directly by writing: Inventory turns COGS / Inventory (b) Cost of Inventory: 25% per year /1.5 turns 16.66% . For a $1000 product, this would make an absolute inventory cost of $166.66 . Q2.4. Apparel Retailing (a) Revenue of $100M implies COGS of $50M (because of the 100% markup). Turns COGS/ Inventory $50M / $5M 10 . (b) The inventory cost, given 10 turns, is 40%/10 4% . For a 30$ item, the inventory cost is 0.4 $30 $1.20 per unit . Q2.5. La Villa (a) Flow Rate Inventory / Flow Time 1200 skiers /10 days 120 skiers per day (b) Last year: on any given day, 10% (1 of 10) of skiers are on their first day of skiing © McGraw Hill LLC. All rights reserved. No reproduction or distribution without the prior written consent of McGraw Hill LLC.
This year: on any given day, 20% (1 of 5) of skiers are on their first day of skiing Average amount spent in local restaurants (per skier) Last year 0.1 $50 0.9 $30 $32 This year 0.2 $50 0.8 $30 $34 % change ($34 $32) / $32 6.25% increase Q2.6. Highway We look at 1 mile of highway as our process. Since the speed is 60 miles per hour, it takes a car 1 minute to travel through the process (flow time). There are 24 cars on ¼ of a mile, i.e. there are 96 cars on the 1 mile stretch (inventory). Inventory = Flow Rate * Flow Time: 96 cars = Flow Rate * 1 minute Thus, the Flow Rate is 96 cars per minute, corresponding to 96*60 = 5760 cars per hour. Q2.7. Strohrmann Baking The bread needs to be in the oven for 12 minutes (flow time). We want to produce at a flow rate of 4000 breads per hour, or 4000/60 = 66.66 breads per minute. Inventory = Flow Rate * Flow Time: Inventory = 66.66 breads per minute* 12 minutes Thus, Inventory = 800 breads, which is the required size of the oven. Q2.8. Mt Kinley Consulting We have the following information available from the question: Level Associate Manager Partner
Inventory (number of consultants at that level) 200 60 20
Flow Time (time spent at that level) 4 years 6 years 10 years
(a) We can use Little’s law to find the flow rate for associate consultants: Inventory = Flow Rate * Flow Time; 200 consultants = Flow Rate * 4 years; thus, the flow rate is 50 consultants per year, which need to be recruited to keep the firm in its current size (note: while there are also 50 consultants leaving the associate level, this says nothing about how many of them are dismissed vs how many of them are promoted to Manager level). (b) We can perform a similar analysis at the manager level, which indicates that the flow rate there is 10 consultants. In order to have 10 consultants as a flow rate at the manager level, we need to promote 10 associates to manager level (remember, the firm is not recruiting to the higher ranks from the outside). Hence, every year, we dismiss 40 associates and promote 10 associates to the manager level (the odds at that level are 20%)
© McGraw Hill LLC. All rights reserved. No reproduction or distribution without the prior written consent of McGraw Hill LLC.
Now, consider the partner level. The flow rate there is 2 consultants per year (obtained via the same calculations as before). Thus, from the 10 manager cases we evaluate every year, 8 are dismissed and 2 are promoted to partner (the odds at that level are thereby also 20%). In order to find the odds of a new hire to become partner, we need to multiply the promotion probabilities: 0.2*0.2 = 0.04. Thus, a new hire has a 4% chance of making it to partner. Q2.9. Major US Retailers a. Product stays on average for 31.9 days in Costco’s inventory b. Costco has for a $5 product an inventory cost of $0.1311 which compares to a $0.2049 at Wal-Mart Q2.10. McDonald’s a. Inventory turns for McDonald’s were 92.3. They were 30.05 for Wendy’s. b. McDonald’s has per unit inventory costs of 0.32%, which for a 3$ meal about $0.00975 . That compares to 0.998% at Wendy’s where the cost per meal is $0.0299 . Q2.11. BCH I = 400 associates, T = 2 years. R I / T 400 associates / 2 yrs 200 associates / yr . Q2.12. Kroger Turns R / I 76858 / 6244 12.3
Matching Supply with Demand: An Introduction to Operations Management 5e Solutions to Chapter Problems Chapter 3 Understanding the Supply Process: Evaluating Process Capacity Q3.1 Process Analysis with One Flow Unit (a) Capacity of the three resources in units per hour are 60 2 /10 12 , 60 1/ 6 10 ; 60 3 /16 11.25 . The bottleneck is the resource with the lowest capacity, which is resource 2. (b) The process capacity is the capacity of the bottleneck, which is 10 units/hr . (c) If demand 8 units / hr , then the process is demand constrained and the flow rate is 8 units/hr (d) Utilization = Flow Rate / Capacity . For the three resources they are 8 /12 , 8 /10 , and 8 /11.25 .
© McGraw Hill LLC. All rights reserved. No reproduction or distribution without the prior written consent of McGraw Hill LLC.
Q3.2 Process Analysis with Multiple Flow Units a) Bottleneck is resource 3 because it has the highest implied utilization of 125%. The demands per hour of the three products are 40 / 8 5 , 50 / 8 6.25 and 60 / 8 7.5 . The total minutes of work demanded per hour at resource 1 is 5 × 5 + 6.25 * 5 + 7.5 * 5 = 93.75. Two workers at resource 1 produce 2 * 60 = 120 min of work per hour. So resource 1’s utilization is 93.75 /120 0.78 . Utilization at the other resources are similarly evaluated. b) The capacity of resource 3 is 60 /15 4 units per hour. Given the ratio of units produced must be 4 to 5 to 6, the process can produce 4 units/ hr of A, 5 units / hr of B and 6 units / hr of C. Q3.3. Cranberry Cranberries arrive at a rate of 150 barrels per hour. They get processed at a rate of 100 barrels per hour. Thus, inventory accumulates at a rate of 150-100 = 50 barrels per hour. This happens while trucks arrive, i.e. from 6am to 2pm. The highest inventory level thereby is 8h*50 barrels per hour = 400 barrels. From these 400 barrels, 200 barrels are in the bins, the other 200 barrels are in trucks. (a) 200 barrels (b) From 2pm onwards, no additional cranberries are received. Inventory gets depleted at a rate of 100 barrels per hour. Thus, it will take 2h until the inventory level has dropped to 200 barrels, at which time all waiting cranberries can be stored in the bins (no more truck waiting) (c) It will take another 2 hours until all the bins are empty (d) Since the seasonal workers only start at 10:00am, the first 4 hours of the day we accumulate 4hours * 50barrels per hour = 200 barrels. For the remaining time that we receive incoming cranberries, our processing rate is higher (125 barrels per hour). Thus, inventory only accumulates at a rate of 25 (150-125 barrels per hour). Given that this happens over 4 hours, we get another 100 barrels in inventory. At 2pm, we thereby have 300 barrels in inventory. After 2pm, we receive no further cranberries, yet we initially process cranberries at a rate of 125 barrels per hour. Thus, it only takes 100 barrels /125 barrels/hour 0.8 hours 48 minutes until all bins are empty. From then, we need another 2h until the bins are empty. Q3.4. Western Pennsylvania Milk We start the day with 25,000 gallons of milk in inventory. From 8am onwards, we produce 5,000 gallons, yet we ship 10,000 gallons. Thus inventory is depleted at a rate of 5000 gallons per hour, which leaves us without milk after 5 hours (at 1pm). From then onwards, clients will have to wait. This situation gets worse and worse and by 6pm (last client arrives), we are short 25,000 gallons. (a) 1pm (b) Clients will stop waiting when we have worked off our 25,000 gallon backlog that we are facing at 6pm. Since we are doing this at a rate of 5,000 gallon per hour, clients will stop waiting at 11pm (after 5 more hours). (c) At 6pm, we have a backlog of 25,000 gallons, which is equivalent to 20 trucks (d) The waiting time is the area in the triangle © McGraw Hill LLC. All rights reserved. No reproduction or distribution without the prior written consent of McGraw Hill LLC.
- width: beginning of waiting (1pm) to end of waiting (11pm) = 10 hours - height: maximum number of trucks waiting: 20 (see part c above) Hence, we can compute the area in the triangle as: 0.5*10hours*20trucks = 100 truck* hours The cost for this waiting is 50$ / truck hour 100 truck hours 5000$ Q3.5. Bagel Store (a) The bottleneck is “Veggies on Bagel”, as it has the highest implied utilization. Resource
Cut Grilled stuff Veggies on Bagel Cream cheese Wrap
Available minutes per hour 60 60
Grilled veggie bagel 3*3 3*10
Veggie bagel
Total
Implied utilization
3*11 0
Cream cheese bagel 3*4 0
54 30
54 / 60 30/60
60
3*5
11*5
0
70
70 / 60
60
0
0
4*4
16
16 / 60
60
3*2
11*2
4*2
36
36 / 60
(b) If we want to keep the product mix constant (i.e. keep the ration between the various bagel types at 3:11:4), we need to scale down demand by 60 / 70 . This leads to the following flow rates: - Grilled veggie: 3 60 / 70 bagels / hour - Veggie: 1160 / 70 bagels / hour - Cream cheese: 460 / 70 bagels / hour If we try to fulfill as much demand as possible, we encounter a problem with Veggie bagels and Grilled + Veggie bagels. Given that we have an implied utilization of 70 / 60% at the bottleneck, we can only fulfill 60 / 70% of demand for these two bagel types. We can meet all of demand for the cream cheese bagels. Q3.6. Valley Forge Income Tax Recall that the demand for the 4 groups is: 1: 15% 2: 5% 3: 50% 4:30% There are three resources, the admin, the junior person, and the senior person. We compute the minutes of capacity they have available every month as well as their work-load, given that there are 50 incoming returns to be processed. This leads to the following computations. Resource
Minutes 1 per month
2
3
4
Total work-
Implied utilization