State Supplement sponsored by:
1
THE NEW ENGLAND EDITION
11
A Supplement to:
95
1
201 16 9
26
2
1 3
91
89
2
95 3
2 2 7
1
93
495
16
89 4
89
95
202
7
91
9
95
93
2
95 2
93 90
90
7
95 91
7
SHIP WITHIN 48 HOURS
3
84
495 6
84
6
6
195
395
95 91
95
95
®
June 8 2022
SAME DAY PARTS AVAILABILITY 24 HOUR TECHNICAL SUPPORT BACKED BY A 75 YEAR BUSINESS Thousands in Service!
Vol. LX • No. 12
“The Nation’s Best Read Construction Newspaper… Founded in 1957.” Your New England States Connection • Kent Hogeboom 315-866-1423 2208 Plainfield Pike • Johnston, RI 02919 401-943-7100 • Fax: 401-647-5041
www.jrvinagrocorp.com info@jrvinagrocorp.com
Specializing in:
Affordable Price. Premium Service.
CALL 800-367-4937 *On approved credit • Financing Available
Cianbro Leads Reconstruction of Veranda Street Bridge in Portland
Demolition, Portable Crushing, Material Sales, C & D Recycling, Land Clearing, Heavy Hauling & Trucking Call for Pricing
LEED Accredited in Waste Management
2022 EZ-Screen 1200XLS
Visit Equipment East for a demo. Authorized Doosan Dealer
Optional 3 Product Conveyor
6’x5’ Double Deck Screenbox Works with 1/2 to 1 3/4 Yd. Loaders, Kohler Diesel, 24” Conveyor Dumps Screened Product 9’ High, Two (2) Year Warranty! $69,900 plus freight.
508-484-5567 (BROCKTON, MA) 978-454-3320 (Dracut, MA) 603-410-5540 (Bow, NH)
Tibbits Equipment Services, Inc.
www.tibbitseq.com
802-479-9696 KWIK KLEET ts Traction Clea ®
Other Screeners Available
EZ-SCREEN
www.ez-screen.com
248-745-5828
Specialty Construction Equipment SALES • RENTALS • HAMMERS Since 1989
‘05 Caterpillar 928G $36,800
MaineDOT photo
Geofoam blocks will fill the space underneath the interstate highway.
By Ken Liebeskind CEG CORRESPONDENT Phil (413) 427-7171
• Largest hammer repair facility in North America • Demolition tools and parts for ALL makes and models
• Exhaust Scrubbers • Perkins Engines • Deutz Engines • Twin Disc/Rockford Clutches
www.foleyengines.com
• Hammer-equipped excavator rentals • Backed by a 75 year family owned business CALL YOUR ONE-STOP HAMMER SHOP™ TODAY!!!
CALL 888-81-GORILLA(46745)
MaineDOT used the Accelerate Bridge Construction technique to reconstruct the Veranda Street bridge in Portland as the key part of a project that will be completed later this year. Using the ABC technique, the old Veranda Street bridge was demolished on April 22 and the new bridge opened on April 25. “Conventional bridge construction techniques would have
involved the construction of a temporary bridge and would have likely created traffic congestion for three or four years,” MaineDOT (MDOT) said. “This ABC method compressed significant traffic impacts to a period of 60 hours.” Cianbro of Pittsfield, Maine, was the lead contractor on the job and was assisted by Shaw Brothers of Windham, Maine. The existing bridge was built in 1961 and after 60 years of heavy use, its condition had deteriorated. The old roadway see VERANDA page 8
Page 2 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Call Mark Doty @ 203-823-2316 2010 WIRTGEN 2100
JRB 1.25YDSD BUCKET
2005 WIRTGEN W2000
Cat power, 6'5" 15mm drum, rigid conveyor, 60% bottoms, good belting with grade, stk# 26377 ................................................$145.000
Fits JRB backhoe hooks, comes with jumper hoses, stk# 27297..................................$3,000
stk# 26376, 7759 hours, Cat, 6’7” drum, good bottoms, grade controls, serviced & ready for work....................................................$115,000
2015 KUBOTA KX080-4
2019 BOBCAT S740
2006 DEERE 50D
stk# 27162, c/air, 2 speed, aux hyds, angle blade, 80% rubber tracks ....................$54,500
stk# 26515, c/air, 2 speed, 12” rubber, 76” bucket, switchable controls, 1240 hrs..$52,500
stk# 27463, c/air, hyd thumb, 24" bucket ........ ............................................................$39,500
2021 DEERE 17G
2019 DEERE 333G
2014 HAMM HD+120IVVH
stk# 27468, hyd thumb, good tracks....$33,500
stk# 27123, c/air, hi flow hyds, 2 speed, forestry package, new tracks, 84” bucket ........ ............................................................$69,500
stk# 24340, 1493 hours, 78” drums, dealer maintained since new, very good condition ...... ............................................................$84,500
See Our Complete Inventory at www.wiclark.com
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 3
PR ROVEN UPTIME WITH UPTIIME KITS SENNEBOGEN, in keeeping with their philosophy to maxim mize uptime, has created UPTIME Kits. Whether you are a service technician in-house or on the road, these kits have everything you need for every servicee, maintenance and PM task in one place. p They were created to save you time and money. Managing hundreds of o related service d nuts to O-Rings parts, from belts and and special tools becomes easy with a single part number to o order and stock. stock
E H T D N O Y BE
E N I H C A M I virtually lose NO downtime
They are: s ock • Easy to order and eaasy to st components l t and d too t ols • Ideal for stocking seervice sshops and trucks owing kits: Choose from the follo • Central lubrication system kits • Preventive maintenance service kits • O-Ring kits • Electrical service kits • Hydraulic service kits k And the best thing iss that these kits, in stock and ready to go, are custommodel built to match your machine m and series. Count on SENNEBOGEN in-house. For more in nformation on he QR code. UPTIME Kits, scan th
over month to go ing rough once a br th st e ju om y] c n he ia [t echnic situation, Theyy have a t ck. Iff I have a downtime… Since they ba o t t on r f , ually lose no every machine ne and I virtu ck quickly. achi g t the unit ba in another m air parts in sttock. I ge ld Hills, MI have the rep t r, Bloomfie ontracto Demolition C rsale afte hee Machine” eyond th out how our “B e for SENNEBOGEN ab e or m ad e R mizes uptim to-ship maxim ories of readycommitment mplete invent om c ith w . s er se custom warehou rth American parts in our No
ns icciiaan t ained tecchn -ttr y r o to t ct ac f N E G SENNEBO
support througho out the life of its equipment. We’re thinking “beyond the machine” to deliver dependable uptime aand lower Total Cost of Ownership (TCO) for every customer.
Parts • Service • Train ning • Application Speciallists • Flexible Financing • Attachments 251 Shaker Roaad East Longmead dow, MA 01028 (800) 292-6351
1980 0 Berlin Turnpike Berliin, CT 06037 (800 0) 352-4473
www.tyleerequipment.com m Learn more about a our commitment to our customers
sennebogeen-na.com/beyond-the-machine -
Page 4 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Boston’s Sumner Tunnel Set to Undergo Monroe Hires New Extensive $157M Repairs, Restoration Product Support Rep. at Conn. Location After nearly a century of service, the Sumner Tunnel running beneath Boston Harbor, a heavily traveled route linking East Boston and Logan International Airport to the rest of the city, is about to undergo an extensive restoration. Beginning June 10, the Massachusetts Department of Transportation (MassDOT) will commence repairs and closures of the 88year-old tunnel, that will not only affect Boston motorists, but residents and businesses in the North End, East Boston and South Boston, state officials said. According to the Sumner Tunnel Project’s page at MassDOT.com, the almost 2-mi.-long roadway passage is to be shuttered on most weekends throughout the rest of 2022, until it is shut down completely for four months in 2023 to perform a “top-to-bottom restoration.” The Boston Globe reported that the $157 million Sumner Tunnel restoration work will address a host of issues, including exposed rebar on the ceiling, crumbling concrete, rusted reinforcements, cracked wall panels, broken light fixtures and poor pavement conditions. The ventilation, drainage, security and fire suppression systems also need to be brought up to code, MassDOT told the Boston news source. The effort to modernize the dilapidated gateway to downtown Boston will mean removing and replacing the tunnel’s ceiling and arch support, reconstructing the tunnel deck, replacing the roadway surface, repairing walls and installing fireproof panels. Plans also call for the Sumner Tunnel to have new LED lights, a new fire alarm system and closed-circuit cameras. “After a thorough review of construction plans and impact reports … the best way to move forward is a fourmonth shutdown in 2023, with weekend closures before and after the full shutdown to complete the project,” described MassDOT on the project’s web page. “This is a fast schedule that involves project-acceleration techniques and economic incentives to
keep things on track.” Starting the weekend of June 10, the Sumner will close from 10 p.m. on Friday to 5 a.m. on Monday for 36 weeks, excluding holidays, according to the MassDOT Sumner Tunnel website. The full shutdown is slated for May 2023, when the tunnel will be closed seven days a week through September. Following that, weekend closures will return and continue intermittently until February 2024, the transportation department explained.
MassDOT Has Plan to Address Public Concerns Still, the agency admitted, the repairs and closures will bring more traffic to East Boston and South Boston and will cause “unpleasant noise and vibrations” in the North End. MassDOT officials told the Globe, though, that noise and vibration will be monitored and “noise suppression devices, enclosures and barriers” will be used as needed. In addition, the construction team will use wetting agents and secure covers on trucks to keep dust under control. MassDOT predicts East Boston residents also will see “more traffic, noise and pollution,” and the number of vehicles will undoubtedly increase in South Boston and along the waterfront as drivers detour through the Ted Williams Tunnel. The state agency added that shutting off the public from using the Sumner Tunnel “is not a decision we’re making lightly. We know the project will impact commuters, travelers and surrounding neighborhoods in different ways. We are committed to finding ways to lower these effects and reduce impact across the board.” Detour routes will be clearly marked, and informational signs will be posted at intersections in East Boston to make people aware of the restoration project and when the tunnel will be closed, MassDOT said. When it opened in 1934, the Sumner Tunnel was the only tunnel that ran under the harbor, and it carried traffic in both directions. It was the first traffic tunnel in Massachusetts, and it is still
one of the oldest in the country, according to MassDOT.
Area Residents Have Various Opinions East Boston resident Andrew Pike, a board member of the Jeffries Point Neighborhood Association, said people in his neighborhood are worried about what lies ahead when the tunnel is closed. “Everybody’s absolutely dreading it,” Pike told the Globe in a phone interview. “It’s going to have a major impact on people trying to get downtown.” When the Sumner Tunnel toll booths were removed in 2017, he added, there was a “dramatic amount of traffic” as drivers were detoured through the Ted Williams Tunnel. He said he “can only imagine” what it will be like when the Sumner is shut down for several months. “The weekend closures [are] one thing. When it’s closed completely for months at a time... I think it’s going to have [a] significant impact on the level of traffic trying to go through the Ted Williams Tunnel,” Pike commented, adding that there also are concerns about the impact on emergency services. “There’s no real hospital on this side of the tunnel,” he explained, and the work will increase travel times to other Boston hospitals. In contrast, another East Boston resident, Neelesh Batra, who serves on the board of the Gove Street Citizens Association, said he understands why the work needs to be done on the Sumner Tunnel. “I’m OK with it. I know our infrastructure is old,” he said. “I’m not exactly sure how they would go about the repairs they are trying to do without shutting it down like this. The full closure is going to be a headache. But it sounds reasonable, and we will get through it.” More information about the Sumner Tunnel restoration work and maps of the detour routes can be found on the project’s website at www.mass.gov/sumner-tunnel-restoration-project.
Mark Wigglesworth
Mark Wigglesworth has been hired as a product support representative for Monroe Tractor’s South Windsor, Conn., location Wigglesworth brings many years of experience in the construction industry. After representing a large parts supplier for the heavy-duty and industrial markets, he effectively managed his territory by building long-lasting relationships throughout the construction industry. Moving his career to be more hands-on, he accepted a position as a heavy machinery operator working on bridges and guard rails to make Connecticut’s roads and highways safer. Wigglesworth will be responsible for helping increase the profit and productivity of each customer by offering them parts and service support and providing customers with onestop shopping for all their equipment needs. “My past work experiences being in the field and selling industrial products have given me the foundation to succeed at Monroe Tractor,” said Wigglesworth. “This enables me to be most beneficial to the customer by understanding the urgency of getting the parts and services needed when they need it most. “I look forward to meeting and building relationships with Connecticut’s customers, providing them with the best service to make their jobs easier.” “We’re excited to have Mark on board, his construction industry experience, combined with his enthusiasm and willingness to go above and beyond for our company and our customers will be a welcome addition to Connecticut’s team,” said Rick Bisesto, branch manager. For more information, visit www.monroetractor.com.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 5
True Pow Power 10/.-,+*,))(/',/&%$#0/"! 0/+!- &/ *-$, / ,/ ! 0% ,$ -$,,) 0 /0*, /0%/ ,) %) / /, -,$0 / / % -+ , / !)/$,'/ / /&% ,)/- / / ,) , 0/, , / 0 / -,)/ /, - -%$ / 0,, /' /&, - $,&/ )% /0*,/ )%!$&/! / $&/-0# / ) 0- / -$0,$ $$ ,/ ),, / *,/* &)% 0 0- /&)- ,/ 0, / !0% 0- / &"! 0 /0%/ ,, /% ,) 0%) /-$/0*,/ ',,0/ %0 / /, ,$/'*,$/ -$ / !, /-$/ / %&, /1$&/ - ,/ / %!)/ *-$, (/0*,/ / /- /+!- 0/0%/ 0/'-0*/, ! - ,/.-,+*,))/components.
Page 6 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
AUTHORIZED DOOSAN DEALER
DRACUT
BROCKTON
BOW
978-454-3320 61 Silva Lane Dracut, MA 01826
508-484-5567 196 Manley St. Brockton, MA 02301
603-410-5540 1474 Rte 3A Bow, NH 03304
www.equipmenteast.com
DESIGNED TO DOMINATE. POWERED BY INNOVATION. Punishing jobsites require rugged machines. New -7 Series wheel loaders are redesigned to help you load more material, carry with confidence and get more done. Visit Equipment East for a demo. ©2021 Hyundai Doosan Infracore. All rights reserved. Hyundai Doosan Infracore is an affiliate of Hyundai Heavy Industries Group. , is used under license from Doosan Corporation. The Doosan trademark,
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 7
AVAILABL VA LE TO RENTT TODAY! AY JCB 35Z Zero Tailswing Excavators
JCB 85Z Zero Tailswing Excavators
JCB 131X Excavators
JCB 150X Excavators
JCB 220X Excaavators
JCB 245XR Reduced Tailswings
JCB Hydradig 110W Wheel Excaavators
JCB 512-83R Rotoating Telehandlers
JCB 509-42 Lift & Placce Telehandlers
JCB 510-56 Lift & Place Te Telehandlers
JCB Compact Wheel Loaders
JCB Wheel Loaders
Bergmann C815s Wh heel Dumpers
Bergmann C912s Tr Track Dumpers
Vibroscreen Box Screenerss
Vibroscreen Tr Trommels
888 8-RNT T--ALTA TA A | AltaRentsNE.co om
Page 8 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
MDOT Eyes Reducing Crashes Codman Yard Project to Improve With New Roadway Geometry Reliability of MBTA’s Red Line A construction contract to expand and upgrade Codman Yard, a rail yard near Boston, has been advertised to bid, it was announced May 20 by the Massachusetts Bay Transportation Authority (MBTA) in a press release. The Codman Yard project is part of the Authority’s Capital Program and Red Line Transformation (RLT). The MBTA is greater Boston’s largest provider of public transportation. The advancements in the rail yard, located
Aerial view of the bridge and construction site.
MaineDOT photo
VERANDA from page 1
geometry underneath the interstate bridge was confusing and contributed to a high incidence of crashes at the intersection of Veranda Street and the I-295 southbound on-ramp, MDOT reported. Planning for the Veranda Street Bridge replacement project began in 2016. Construction began in March 2021. Crews built the foundations for the new structure beneath the existing bridge while also building two new bridge decks on the east side of the interstate. Each of these new bridge decks weighs approximately 800,000 lbs. and was set atop the new foundations during the interstate closure. This project also involved the use of geofoam blocks as fill in the bridge embankments. The project called for workers to raze see VERANDA page 16 MaineDOT photo
A view of the construction site, looking west.
MaineDOT photo
Looking south at the new bridge deck.
will allow Codman Yard to park more than 100 cars. MBTA added that other improvements include updating the inspection pit, the Ashmont double crossover and vehicle wash, in addition to the lighting and power throughout the yard to provide an expanded, improved and fully functioning railroad yard. “Executing these improvements will bring several benefits to the entire Red Line system,” said Angel Peña, the transportation agency’s chief of capital transformation. “Our plans to improve and expand Codman Yard [will] increase capacity, site security and safety, and decrease overall noise. As we strive to provide our riders with a more reliable system and the best quality of service possible, these advancements will help us achieve that goal.” The MBTA expects to award the contract this summer and begin construction by the fall, with a projected completion in last few months of 2025. However, Peña’s team is constantly looking for ways to accelerate the timeline to revamp Codman Yard Steve Poftak and bring the much-needed improvements to the public sooner, he MBTA explained. Before any construction begins, the Red Line Transformation team will hold a public meeting to south of the city in Dorchester Center, are communicate the expectations prior to the designed to increase MBTA’s capacity and builder mobilizing the site. improve the overall reliability and quality of service for all riders. Codman Yard Part of Much “Yards are crucial to providing efficient Larger Effort service to the entire system,” said MBTA Capital Transformation’s mission is to General Manager Steve Poftak. “They are transform the transit system by investing in where we store, maintain and deploy vehi- large, long-term improvements to better the cles each day. Improving Codman Yard is quality of service for MBTA users and the first step towards improving the quality neighboring communities. of service for all riders on the Red Line and Its capital investments address distinct in the surrounding community.” levels of transformation, which include: In addition to storing the vehicles, rail • Improving safety. yards also allow the MBTA to perform qual• Bringing infrastructure into a state of ity checks, make any necessary improve- good repair. ments and keep the rail car interiors clean • Enhancing accessibility. without disrupting regular service. • Replacing legacy fleets. A projected cost for the expansion was not • Increasing passenger capacity. revealed by MBTA officials. • Modernizing rider experience. • Expanding service. Rail Capacity, Security, Safety to The Codman Yard improvements are only Be Upgraded one part of MBTA’s $8 billion, five-year Codman Yard currently has 16 storage capital investment plan. Within the evolving tracks that can hold approximately 70 vehi- program, the agency also is renovating stacles. tions, modernizing fare collection systems, The new project is set to build six new upgrading services for its buses, subways storage tracks and replace those that already and ferries, and improving the accessibility exist. Expanding the yard with new tracks of the entire system.
“Yards are crucial to providing efficient service to the entire system. They are where we store, maintain and deploy vehicles each day.”
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 9
YOU O R REPUTA TATION IS ON THE LINE EVERY RY DA AY. Jobs keep getting tougher. Timelines keep getting shor ter. Yo Y ou need to get it done faster and more ef ficiently. We get it. That’s why we’ve been making the big moves that keep yo y u moving for ward. Rolling out new machines engineered with a “get it done” mentality. Providing Af After Sales Solutions that keep you up and running. Because yo y u’ve earned it. And your customers deser ve it.
hitachi h cm.us Hitachi Construction Machiner y A mericas Inc.
Milford, NH 603.673.2640
Brentwood, NH 603.642.5666
chappelltractor.com
Concord, NH 603.225.3361
Now Your Hitachi Dealer for Vermont, New Hampshire and Massachusetts
Page 10 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
ROCK SOLID SERVICE WE CRUSH YOUR ROCKS
140 Nutmeg Road South South Windsor, CT 06074 51 Veterans Drive Loudon, NH 03307 LARGEST DEALER IN NEW ENGLAND
THE MOST MATERIAL HANDLING MACHINES IN NEW ENGLAND SCREENING CRUSHING CONES IMPACTORS CONVEYORS TROMMELS WASHING RECYCLING
SCREENING
I M PAC T O R S
TROMMELS
USED AND NEW MACHINERY RENTALS AND FINANCING AVAILABLE
CONVEYORS
CRUSHING
1-800-53 CRUSH
Over 100 Machines in Stock
CALL TODAY! 1-800-53-CRUSH
W W W. P O W E R S C R E E N - N E . C O M Family Owned and
Operated for over 20 years
Call for Parts Today
ROCK SOLID SERVICE WE CRUSH YOUR ROCKS
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 11
Page 12 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Library Plans $28M Expansion to Bring It Into 21st Century The original structure, the historic Saunders House, was built in 1764 and converted to library use in 1884. The Sawyer Free Library in Gloucester, Mass., is going ahead with its plan to construct a 15,000-sq.-ft. addition on its School Street side. The effort is estimated to cost $28 million but is designed to update the old city’s library into a modern, more A view of the Sawyer Free Library’s planned addition, extending toward school street is seen in this rendering. inviting space. “What we are looking at is a renovation addition that will bring us into the future,” Simon Paddock, a Sawyer Free Library trustee and chair of its Capital Projects Committee, said while speaking to the Gloucester Daily Times. The Gloucester Lyceum and the library have served the seaport on Cape Ann from the corner of Dale Avenue and Middle Street for 138 years. Next year, the city will mark 400 years since its first settlement. The Sawyer Free Library is a popular retreat in the northeastern Massachusetts town, as nearly 15,000 people, just under half of Gloucester’s population, hold a library card. Project Fundraising Is Ongoing Library officials recently previewed what the “2025 Sawyer Free Library” project will involve, saying construction will start in early 2023 and take approximately 18 months. During construction, the library will remain open, but will move to a temporary location that has yet to be determined, Jenny Benedict, the library’s director, told the Gloucester news source. The project will be funded through philanthropic donations supported by an integrated media fundraising campaign that launched the second week of May. A $9.3 million matching grant from the Massachusetts Board of Library Commissioners Construction Grant Program is expected to pay for a third of the estimated cost, according to the Daily Times. A provisional grant announcement is expected this summer.
Oudens Ello Architecture rendering
Oudens Ello Architecture rendering
The design concept for the renovation of the from of Sawyer Free Library. It preserves the facade designed by Donald Monell.
Including the grant, the campaign has thus far raised $14.1 million, the newspaper reported May 11. Library officials said the goal is to increase annual visits by 25 percent, public programming by 25 percent, and the number of programs hosted by its many partner agencies by 50 percent. Updated Gloucester Library Desperately Needed Marion “Mern” Sibley, president of the library’s Board of Trustees, said a lot has changed since the Monell Building, the
library’s main building, was completed in 1976. In speaking with the Daily Times, Sibley said the present library lacks meeting space, restrooms need to be updated to be fully compliant with the Americans with Disabilities Act (ADA), and there are no private reading rooms. In addition, the building’s systems have reached the end of their usefulness, and the building is unsuited for modern technology. The original structure, the historic Saunders House, was built in 1764 and converted to library use in 1884. It was added
onto in 1913 and again in 1976. The Saunders House is presently used as staff offices and storage. A separate project is planned to restore and open it to the public. The Gloucester newspaper reported that the push to update the library dates to 2016, when officials submitted a schematic design to the Massachusetts Board of Library Commissioners to replace the Monell Building in its entirety. But the community rejected that approach, which led to the idea of renovating the existing Sawyer Free Library building see LIBRARY page 14
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 13
The Nice Company, Inc
9 Rosenfeld Drive, Hopedale, M A Toll Free# 508-381-3939 • w w w.theniceco.com
Equipment Sales and Rentals
We sell NICE machines!
2017 Doosan DX235LCR-5, 2500 hrs., reduced tail swing, 36” bucket, hyd. thumb, aux. hydraulics, heat/AC, good condition, work ready. $139,000
2018 CAT 320FL, 3800 hrs, 50" Strickland Bucket, QC, Aux. Hydraulics, Clean Cab, Front/Side Cameras, Work Ready $169,000
Spring Specials 2018 CAT 336+FL, 2500 hrs, Single Grouser Pads, 54" Bucket, QC, AC/Heat/Radio, Rear Camera, Long Undercarriage $279,000
2014 CAT D6K2 XL, 960 hours, Heat/AC/radio, Very Clean, 1 Owner Machine $169,000
Page 14 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Gloucester Plans Significant Upgrade to Town’s Aging Library LIBRARY from page 12
instead, Paddock said. Those plans are currently in the design and development phase, he told the Daily Times, which includes refinements to the interiors and exteriors. Boston-based Oudens Ello Architecture is the library’s architect and has started the process of selecting a construction manager. In February, the Gloucester City Council approved “construction manager at risk” as the preferred procurement method for the project. This approach allows the project to have the construction manager involved much earlier in the process. What Features Will Be Found in Renovated Library? The expansion project will increase the library’s space by using a portion of the parking lot at the back of the building
— something Paddock said has always been contemplated. “That space was made available for the addition early on in the project,” he explained. The architect’s plans call for the first floor to be a large reading room with book stacks as well as a quiet reading room and a 14-seat conference room. Other additions and upgraded portions of the library include: • A dedicated space for children and teens on the second floor, areas that are now found on the ground floor. A separate teen room will feature a creation space where they can do homework, meet friends, or explore creative interests. • On the ground level, a 100-seat community meeting room with a kitchenette, presentation area and flex space offering after-hours access is to be built. Additionally, it will feature a digital maker space with an audio and video recording studio, and a climate-controlled Local History Center that chronicles Gloucester’s history.
• The Matz Gallery, where local artists display their work, will be expanded in the walkway connecting the library and the Saunders House. • The project will preserve the library’s popular outdoor amphitheater out front. Paddock added that accessibility, sustainability, health and safety have been key components of the Sawyer Free Library project. For instance, the building’s front entrance on Dale Avenue will be made handicapped accessible — something which it is currently not. Peter Lawrence, a member of the Capital Projects Committee, told the Daily Times that to tackle climate change, the new library’s buildings will be LEED Gold Certified Net-Zero-Ready with energy efficient systems, solar panels and battery backup that could serve as an educational demonstration project. He explained that the library plans to secure a 100 percent renewable energy source for the added electricity.
Lebanon, Maine, Hopes New Work Moves Forward On New Bridge Will Be Built Soon Wing of Brattleboro, Vt., Hospital A new timeline has been established to restore a vital link between two communities on the Maine-New Hampshire border after they were cut off more than 10 years ago. Back in 2012, the span over Salmon Falls River that connected the New Bridge Road in Lebanon, Maine to Milton, N.H., was demolished after it was deemed unsafe. It was located next to the New Bridge Marina in the small Maine community. Since then, those living along the road feel as if they have been cut off. “It was fairly busy,” said Joel Dockham, who has lived on New Bridge Road for more than 30 years. “Just business-wise, [with] the marina and stuff, I know that really hurt.” While there are other ways to get into New Hampshire, the detour adds miles to the drive, noted Portland, Maine’s WGME-TV in a recent report. There also have been concerns with public safety since the closest fire and police station are just across the river in Milton. “It probably adds another five minutes or so,” Dockham said, noting that Milton’s two first-responder stations are off Town House Road, which led to the razed bridge. In recent years, plans and dates have been put forward on when the bridge could finally be replaced. The town of Lebanon has even set aside $140,000 for the project. “Just the promises of, ‘Yeah, we’re going to do it, we’re going to do it,’ but it
hasn’t happened,” Dockham told the TV station. “You kind of hear a date but then it comes and goes. So, it’s a little frustrating.” Reconstruction Could Begin in 2024 The CBS13 I-TEAM, WGME-TV’s investigative news division, contacted the transportation departments in both Maine and New Hampshire recently to find out where the project stands. Maine DOT said it would be splitting the project 50/50 with the New Hampshire Department of Transportation (NHDOT), but that the latter is taking the lead on the new bridge’s construction. Both agencies noted that an agreement was signed in March, followed shortly thereafter by the start of the design process, CBS13 reported. “The final design should be finished in 2023,” the two state agencies wrote in a joint statement. “Construction is likely to happen in 2024, and the plan is to put in a single-span bridge on the same alignment as the previous structure.” According to NHDOT, the new bridge connecting Milton, N.H., to Lebanon, Maine, is estimated to cost around $2 million with both municipalities expected to contribute some of the funding. Folks on both sides of the river who once relied on the bridge are keeping their fingers crossed that the project will finally become a reality. “I’d just like to see the bridge back,” Dockham said.
Despite a few challenges, construction is back under way at Brattleboro Memorial Hospital (BMH) in Vermont for its new surgical wing, scheduled to open in a few months. “Since construction started, we have had some delays resulting from COVID restrictions, as well as labor shortages,” Gina Pattison, director of development and marketing at BMH, told the Brattleboro Reformer. “We had hoped to open the building in April, but now plan to have the Ronald Read Pavilion open in early July.” The Vermont office of HP Cummings Construction Co., located in Waterbury, is managing the building effort. At approximately 27,000 sq. ft., spread over four floors, the hospital’s new wing allows BMH to replace and increase the size of the existing operating rooms to provide a more efficient workflow and meet size requirements. The construction of the medical center also will be able to: • Upgrade BMH’s central sterile processing area to a larger space and provide a more efficient flow of equipment. • Relocate and make larger its minor procedure area and post-anesthesia care unit to be closer to the new operating rooms. • Add more and larger spaces for storage. • Move existing medical practices into a more modern and efficient space. • Provide a larger and brighter space for the cardiac rehabilitation department that is more accessible to patients. Rob Prohaska, the director of plant services at BMH, gave the Reformer a tour of three
new operating rooms under construction and described the project as being all about modernizing the hospital. “This is giving us more room for what we have in terms of services here at Brattleboro Memorial,” he said. Unlikely Source Donated $6M to Hospital Project Initially expected to cost about $22.7 million in 2017, the project’s price tag now is estimated to be $26,750,895, Pattison told the Brattleboro news source, adding that the revised projection has been approved by the Green Mountain Care Board, which reviews and establishes community hospital budgets in Vermont. The Reformer noted that a document from the hospital recently submitted to the board read, “Now, with all permits obtained, and having weathered the COVID-19 public health emergency, project construction has resumed, but the cost of needed labor, materials and equipment to fully construct the project as applied for has increased significantly.” The construction’s costs are being partially paid for with a $6 million bequest from Ronald Read, who died at age 92 in 2014. Read, who worked as a janitor and lived in Brattleboro, quietly amassed an $8 million fortune after investing in the stock market and donated funds to not only the hospital, but the town’s Brooks Memorial Library as well. In addition, BMH took out a $12.5 million bond for the project, and other investment funds will be used to cover the costs, according to the document submitted to the board.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 15
2021 MCCLOSKEY SDX130: Serial Number: 90666, New Telescoping Stacker 36"x130' Electric Hydraulic Power WEG 20HP. Standard Hopper, Pivot Point, Hydraulic Landing Gear, Hydraulic Wheel Drive, Remote Greaselines, Walking Beam w/Lift Axle >>>Call
2022 MCCLOSKEY ST100T: Hours: 53, Serial Number: 92129, Stacker with Impact Idlers Under Hopper, Upgraded Belt Cleaner/Scraper, Telematics, Upgraded Hydraulics, CAT C2.8 Tier 4F/ Stage V 74HP Engine>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2005 EXTEC C12: Hours: 8,310, Serial Number: 9658, Deutz Engine, Rebuilt recently and runs great. New jaw bearings and shaft. New main jaw drive motor. Jaw dies replaced recently. Discharge belt replaced recently>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>$169,500
2020 MCCLOSKEY C3: Hours: 1560, Horsepower: 510 hp, Serial Number: 91189, METSO designed cone, 300 HP Class. Volvo D13 Medium Cone Liner currently installed.>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2021 MCCLOSKEY J40: Hours: 275, Serial Number: 90232, Belt Protection Deflector Plate, Overband Magnet on Main, Working lights, Safety Beacon Lights, Telematics, Volvo D8 T4F 252HP Engine>>>>Call
2022 MCCLOSKEY TS4065: Hours: 14, Serial Number: 78648, Tracked Stacking Conveyor with Standard Hopper, Wear Plate Lining in Hopper, Impact Bed in Hopper, Hydraulic Top Fold, Remote Greaseline, CAT C2.2 Tier 4/Stage V 67HP Engine >>>>>>>>>>>>>>>>>>>Call
2020 MCCLOSKEY S190 3D: Hours: 536, Horsepower: 130 hp, Serial Number: 91405, Tracked Triple Deck Heavy Duty Screener. CAT Tier 4F Engine. 15ft Feeding Hopper. Chevron Belt on Main Conveyor. Remote Machine Shut Off >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2021 MCCLOSKEY RF80: Hours: 25, Serial Number: 77883, Hopper Wear Plates, Extended Hopper Wing Plates, Upgraded Belt/Cleaner Scraper, Variable Speed and Start Stop Feeder Kit, CAT C3.6 Tier 4/Stage V 134HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2006 EXTEC ROBOTRAC: Hours: 5,008, Serial Number: 9872, Well maintained. Deutz Engine. 10’x8’10” screen deck with side discharge conveyor>>>>>>>>>>>>$59,500
2021 MCCLOSKEY R155: Hours: 276, Serial Number: 91850, Remote Variable Speed Feeder, Safety Beacon Lights, Telematics, CAT Tier 4F 130HP Engine >>>>>>Call
2003 TEREX PEGSON 2644 PREMIERTRAK: Hours: 11,448, Engine: Cat C9, 1 Owner Machine, New Jaw Dies, New Cheek Plates, Jaw Box has been recently rebuilt, New Bearings in Pittman, New Toggle >>>>>>>>>>>>>$225,000
2021 MCCLOSKEY R105: Hours: 807, Serial Number: 77461, Screener with Remote Variable Speed Feeder, Remote Machine Shut off, Safety Beacon Lights, Telematics. CAT Tier 4F 130HP >>>>>>>>>>>>>>>>>>>>>>>Call
2021 MCCLOSKEY ST80: Hours: 6, Serial Number: NEW MWS CSP200 COMPACT SAND PLANT, Serial 92183, CAT 2.2 Tier 4F 49 HP, Hydraulic Axle Jacks, Number: 20349, cost and energy efficient, exceptional Hydraulic Axle Extensions, Hydraulic Landing Gear, performance, 14 x 6 dewatering screen, can produce Hopper Wear Plates, Impact Idlers under Hopper Call 1 grade of sand, self regulating sump tank >>>>>>>Call
2021 MWS S190: Hours: 38, Serial Number: 91989, Screening Plant with Fitted Rinser Kit with Spray Bars on Screenbox, Aux Drive Circuit, Plain Belt on Main Conveyor >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
2021 MCCLOSKEY C2: Hours: 203, Serial Number: 92089, Metal Detector on Feeder, Discharge Chute on Main Conveyor, Upgraded Belt Cleaner/Scraper on Main, Telematics, CAT C9.3B Stage V/Tier 4F 375 HP Engine >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>Call
NEW ENGLAND’S EXCLUSIVE MCCLOSKY DEALER!!!
Page 16 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
Cianbro Gets Assist From Shaw Brothers On Portland Project MaineDOT photo
Crews perform concrete placement for a bridge abutment.
A view of the new bridge deck construction with Casco Bay in the background. VERANDA from page 8
the existing bridge, remove the rubble and use massive self-propelled transporters to lift the prefabricated bridge deck into place, officials said. The new bridge was built in two sections that were installed after the old bridge was demolished. Demolition of the old bridge began as soon as I295 closed on April 22. The last beams from the old bridge were removed late morning on April 23. SelfPropelled Modular Transporters (SPMTs) began moving the new southbound bridge span into place and then moved the new northbound span into place. This was the first time MaineDOT used SPMTs. The SPMTs were provided by Mammoet of Rosharon, Texas, a company specializing in engineered
MaineDOT photo
heavy lifting and transport of oversized and heavy objects. “Mammoet utilized our MJS300 [modular jacking system] and 48 axles-lines of SPMTs [self-propelled modular transporters] to move bridge spans related to the Veranda Street Bridge project in Maine,” said Amanda Lunsford, Mammoet marketing manager. “Mammoet was allotted 12 hours to move both the southbound and northbound spans into place and set; however, this was accomplished in only 9.5 hours. Each span weighed 800,000 lbs. [400 tons] and measured 80 feet long by 47 feet wide. “This was the first time that Mammoet used its MJS300 system and cradles on a highway bridge,” she added. “The one-of-a-kind innovative system is integrated in that it allows the jacks to sit in cradles, which are built inside the trailer. This saved our client see VERANDA page 18
MaineDOT photo
This was the first time that Mammoet used its MJS300 system and cradles on a highway bridge.
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 17
Discover the NEW A-Series Hyundai Construction Equipment is excited to announce the launching of our new A-series machines. Along with a new look, these machines are packed full of standard new features and benefits to get the job done efficiently. • Cummins Performance Series Engines Stage V emissions compliant engines • EPFC (Electric Positive Flow Control) Reduces daily fuel consumption by 8-11% • EPIC (Electric Pump Independent Control) Improved controllability with reduced RPM drop • Serviceability/Safety Enhanced cab visibility Easy access engine panels
More standard features. More value.
www.hceamericas.com To learn more about the what the new Hyundai A-Series machines can offer your business, contact your Hyundai dealer today.
Chappell Tractor 251 NH-125 Brentwood, NH 03833 603/642-5666
454 RTE 13 Milford, NH 03055 603/673-2640
Kahn Tractor & Equipment, Inc.
Whited Equipment Co. 2160 Hotel Road Auburn, ME 04210 207/346-0279
17 Houlton Road Presque Isle, ME 04769 207/346-0279
520 Pond Road North Franklin, CT 06254 860/642-7596 www.kahntractor.com
391 Loudon Rd. Concord, NH 03301 603/225-3361 www.chappelltractor.com
837 Portland Road Saco, ME 04072 844/430-6810 www.whitedhyundai.com
Lorusso Heavy Equipment, LLC
Quality Fleet Service, Inc.
Butler Equipment
160 Elm Street Walpole, MA 02801 508/660-7600 www.lhequip.com
548 New Ludlow Road South Hadley, MA 01075 413/213-0632 www.qualityfleetservice.com
631 New Park Ave West Hartford, CT 06110 860-233-5439 www.butlerequip.com ©2022 Hyundai Construction Equipment Americas. All Rights Reserved.
Page 18 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide
NEW ENGLAND SUPPLEMENT ADVERTISER INDEX
Crews Employ ABC Method to Construct New Bridge
ALTA EQUIPMENT COMPANY/NITCO LLC ....................7
MaineDOT photo
Seen here is the new bridge deck from street level.
ARGUS INDUSTRIAL COMPANY ....................................1 BARRY EQUIPMENT CO. INC. ......................................20 BOSTON FREIGHTLINER/NEW ENGLAND....................5 CHADWICK-BAROSS INC..............................................11 CHAPPELL TRACTOR......................................................9 EQUIPMENT EAST ........................................................1,6 FOLEY INC - WORCESTER ............................................1 GORILLA HAMMERS........................................................1
MaineDOT photo
Looking south across Veranda Street at the new interstate bridge beams.
HYUNDAI CONSTRUCTION EQUIPMENT....................17 J R VINAGRO CORPORATION........................................1 M G EQUIPMENT ............................................................1 POWERSCREEN NEW ENGLAND................................10 VERANDA from page 16
ROCK & RECYCLING EQUIPMENT LLC ......................15 ROGERS BROTHERS CORPORATION ........................19 SHAWMUT EQUIPMENT CO INC ..................................16 T-QUIP SALES & RENTAL INC ......................................13 THE N.I.C.E. COMPANY ................................................13 THE W. I. CLARK COMPANY ..........................................2 TIBBITS EQUIPMENT SERVICES INC ............................1 TYLER EQUIPMENT CORPORATION ............................3 The Advertisers Index is printed as a free editorial service to our advertisers and readership. Construction Equipment Guide is not responsible for errors or omissions.
time and money by not requiring the set up and transport of two separate systems [a jacking system and a falsework system], which are typically required. Mammoet jacked each span up 18 feet in the air using 14 cassettes in the modular jacking system raising the bottom of girder approximately 20 feet off the ground. Each span was precisely moved on 48 axle-lines [12 x 4 lines] of SPMTs and set into position, aligned and lowered. “Mammoet employed a crew of six, plus three iron workers. The project was executed ahead of schedule and without incident or injury. The new bridge is designed to last for the next 100 years. This was the first accelerated bridge construction project ever completed in Maine.” “We did demo work, grading and paving for the project and placed geofoam below the bridge,” said Chris Dyer, project manager of Shaw Brothers. The company used Cat 329, John Deere 225 and Komatsu 170 excavators on the project, a Cat 938 loader, a Komatsu D39 dozer and a Volvo wheel loader, he said.
More work on this project will continue in the coming months. MaineDOT is planning another paving operation in October. Parts of the interstate roadway on either side of the new bridge will likely settle as much as one inch throughout the next several months. This is normal and expected. All work is scheduled to be finished by the end of 2022, MaineDOT said. When the project is completed, the reconfigured Veranda Street will consist of two 11-ft.-wide vehicle travel lanes, two 5-ft.wide bicycle lanes, a 5-ft.-wide sidewalk on the north side of the road and a multi-use path on the south side that extends to the Martin’s Point Bridge. The revised roadway configuration also will allow for an open green space between the reconfigured Veranda Street and the nearby shoreline. This change accounts for nearly 1.5 acres of roadway/median to be converted into the green space area. The construction contract for this project is approximately $18.1 million. The total project cost (including engineering and design work) is approximately $20.8 million. CEG
Construction Equipment Guide • New England States Supplement • www.constructionequipmentguide.com • June 8, 2022 • Page 19
TRAILERS TO MEET EVERY HAULING CHALLENGE! Committed to building superior quality, reliability and durability into every trailer.
The Ultimate in Trailers®
Tyler Equipment 251 Shaker Road East Longmeadow, MA 01028 (413) 525-6351 • (800) 292-6351 Parts: (877) 255-6351
1980 Berlin Turnpike Berlin, CT 06037 (860) 356-0840 • (800) 352-4473 Parts: (860) 356-0848
ROGERS BROTHERS CORPORATION ALBION, PA
C.N. Wood Co., Inc. 200 Merrimac St. Woburn, MA 01801 (781) 935-1919
140 Wales Ave. Avon, MA 02322 (508) 584-8484
3 Rocky Hill Road Smithfield, RI 02917 (401) 942-9191
www.cn-wood.com
www.tylerequipment.com
Over a CENTURY of building the very best heavy-duty trailers for your hauling needs! Contact your local dealer for a quote today.
Page 20 • June 8, 2022 • www.constructionequipmentguide.com • New England States Supplement • Construction Equipment Guide