Skip to main content

CondoBusiness Fall 2026

Page 1

Canada’s Most Widely Read Condominium Magazine

FALL 2026 VOL. 41 NO.3

SAFETY RECHARGE

Uncovering the risks of lithium-ion batteries

VOLUNTEER

COMMITTEES: PROS & CONS

RESERVE FUND PLANNING TIPS

P A R T

O F

T H E

PM#40063056

PA R T O F T H E


Proven. Trusted. Unmatched for Over 65 Years. We're not just another contractor, we're the go-to experts in exterior construction for major municipal, industrial, commercial, and private projects. From groundbreaking to finishing touches, we deliver excellence without compromise. Because we're not just building structures — we're building legacies that last.

Pacific Paving Ltd. 5845 Luke Road, Unit 204, Mississauga, ON. L4W 2K5 T. 905-670-7730 F. 905-670-7631 info@pacificpaving.ca pacificpaving.ca

LOYALTY. QUALITY. DEPENDABILITY. EXPERIENCE. ASPHALT PAVING | WATERMAIN REPAIRS | CONCRETE WORKS | 24 HOUR EMERGENCY SERVICES | BUILDING RESTORATION SERVICES


Find Inside In every issue 4

Editor’s Note

58

New & Notable

28

Department FEATURE TAKING ‘CHARGE’ OF SAFETY 30 Lithium-Ion Batteries: Fire Risks and Condo Rules By James Davidson and Nancy Houle

OPERATIONS & MAINTENANCE 8

ealth Officials Tap Water H Management Programs

56

eating & Cooling Upgrades H y Ahmed Alyousif B

32 Selecting Certified Products & Safe Disposal

and Pierre El-Khoury

By Sally Thompson

35

Vs in Multistorey Parking E Garages

LEGAL 21

By Sally Thompson and Sam Soltani

TECHNOLOGY 6

pcoming Email Changes to U Impact Condo Systems

24

merging Tech Redefines E Aging in Place By Rebecca Melnyk

GOVERNANCE 18

Making Committees Work By Val Khomenko

MANAGEMENT

uperior Court Confirms S Amlani Ruling By Jake Fine

46

eserve Fund Planning Tips R y Laura Gurr B

50

trata Management in B.C.: S Two Perspectives By Ryan Stenquist and Wendy Wall

The Digital Governance Gap By Shane Haskell

and Megan A. Alexander

By Aaron Lazare

44

44

ENERGY & SUSTAINABILITY 38

sing Utility Data to Improve U Condo Performance By Scott Rouse

FINANCIAL MANAGEMENT 54

hat Condo Boards Should W Do Before Audit Season By Harjoet Mudan


EDITOR’S NOTE

Powering Up Safely NEWLY PROPOSED AMENDMENTS to Ontario’s Fire Code would prohibit charging, parking or storage of micromobility devices and/or their lithium-ion batteries in public corridors, lobbies encompassing an exit to the outdoors or near any other exit. That is just one potential provision under the Ontario’s Provincial Offences Act. The safe handling of lithium-ion batteries has become a charged topic over the past year, particularly after a series of related fire incidents in multi-residential buildings. In response, engineers, condo lawyers, and management professionals are bringing their insight to the conversation. As we head into late fall, our new issue explores this trending discussion as it relates to legal issues, parking garages, and the safe selection and disposal of batteries. As well, our authors dig into everything from reserve fund planning and auditing to volunteer committees and new legal cases. As the condo industry looks forward into the future, technology inevitably plays a central role in many upcoming changes. As such, we delve into the potential of aging-in-place technology, another Microsoft deadline by the end of December, and the operational risks that can arise from a corporation’s lack to modernize. You’ll find many other tips as you flip through magazine. Wishing you a cozy season ahead. And as always, check out our REMI Network website for more news!

Rebecca MeInyk Editor, CondoBusiness rebeccam@mediaedge.ca

SUMMER 2026 Vol. 41 No.2

Editor Rebecca Melnyk Publisher Andrea Almeida Senior Graphic Designer Roxy Huynh-Guinane Graphic Designer Amanda Spearman Production Manager Ines Louis Advertising Sales Sean Foley Ron Guerra Contributing Writers Megan A. Alexander, Ahmed Alyousif, James Davidson, Pierre El-Khoury, Jake Fine, Laura Gurr, Shane Haskell, Nancy Houle, Val Khomenko, Aaron Lazare, Harjoet Mudan, Scott Rouse, Sam Soltani, Ryan Stenquist, Sally Thompson, and Wendy Wall. Subscription Rates Canada: 1 year, $30*; 2 years, $55* Single Copy Sales: Canada: $10*. Elsewhere: $12 USA: $85 International: $110 *Plus applicable taxes Reprints: Requests for permission to reprint any portion of this magazine should be sent to info@mediaedge.ca. Circulation Department Adrian Holland circulation@mediaedge.ca CONDOBUSINESS is published four times a year by

President Kevin Brown Director & Group Publisher Sean Foley Accounting Manager Michele Therien 251 Consumers Road, Suite 1020 Toronto, Ontario M2J 4R3 (416) 512-8186 Fax: (416) 512-8344 e-mail: info@mediaedge.ca CONDOBUSINESS welcomes letters but accepts no responsibility for unsolicited manuscripts or photographs. Canadian Publications Mail Product Sales Agreement No. 40063056 ISSN 0849-6714 All contents copyright MediaEdge Communications Inc. Printed in Canada on recycled paper. Return Undeliverable Canadian Addresses to Circulation Dept: 365 Evans Avenue, Suite L10, Toronto, Ont. M8Z 1K2

/condomediaedge /condobusiness /condomediaedge

4

| Fall 2026


www.ambientmechanical.ca

WHY US?

CONNECTED BUILDING SERVICES PROJECT & CONSTRUCTION MANAGEMENT

With a customer first approach and a strong emphasis on building effective relationships, Ambient Mechanical is your singular solution for all your Connected Building Services.

SYSTEM RETROFIT & DESIGN HVAC REPAIR & MAINTENANCE ELECTRICAL BUILDING AUTOMATION SYSTEMS PIPEFITTING

DELIVERING CONNECTED BUILDING SERVICES

CONNECT WITH US

905-738-1768 OR AMBIENTMECHANICAL.CA


TECHNOLOGY

Upcoming Email Changes To Impact Condo Systems A second Microsoft deadline puts communication at risk. By Aaron Lazare

B

y the end of December 2026, Microsoft will change how systems are allowed to sign in to send emails, such as trouble alerts, status reports, or notices that something needs attention. This could cause potential disruptions within condo corporations because many systems that keep residential communities operating send emails. The access control platform, the camera recorder, the elevator monitoring, the generator and leak sensors, and the controllers in the mechanical room are a few examples.

6

| Fall 2026

WHAT IS CHANGING For years, older devices and applications have sent email through Microsoft 365 using basic authentication, a simple username and password. Microsoft is retiring that method because it is easy to abuse. Basic authentication for sending mail will be disabled by default for existing tenants. Administrators will be able to turn it back on if they must, and Microsoft has said a final removal date will follow in the second half of 2027. The practical point is simpler than the

timeline. Any device still signing in the old way will, by default, stop being able to send its mail. The replacement is a modern method called OAuth, and the device or its vendor has to support it. THE FAILURE MODE IS THE PROBLEM When one of these systems loses its ability to send mail there is no error message flashing on a screen. The alert simply stops arriving. The generator runs its weekly test, but the report never comes.


TECHNOLOGY

event; or a trouble signal that never reached the person who could act on it. The core life-safety function of a fire panel, its alarm and monitored connection, does not depend on Microsoft email. The convenience notifications that ride alongside it can. Knowing which systems fall into which category is the whole reason to look. The test for each one is simple: if its email went quiet tomorrow, would anyone notice and would it matter? A trouble signal someone pursues sits in a different category than a routine report that goes unread. Sorting them that way highlights where a failure might be a nuisance or a risk.

The leak sensor detects a problem, but its warning never reaches anyone. The copier scans to email, but the scans stop landing in inboxes. The system still works. The communication doesn’t. WHERE THE EXPOSURE TURNS SERIOUS A silent gap is an operational nuisance for most notifications, but it can grow more concerning: a leak unreported over a weekend; a generator fault nobody was notified about before a power

WHY THIS REACHES THE BOARD Under Ontario’s Condominium Act, a condominium corporation carries real duties: it must keep adequate records and its directors must oversee how the corporation is run. A silent communication failure reaches both. When a maintenance alert, an access log, or a monitoring report is generated and then lost, that gap is the corporation’s to account for. Directors answer for how the property operates, so a problem that begins as a technical setting becomes a board matter. The consequence lands on the corporation and its directors. A PRIOR CHANGE A related change is arriving on much the same timeline. Exchange Web Services, the older method many applications use to reach calendar and mailbox data in Microsoft 365, began its phased retirement in October 2026 and will fully shut down in April 2027. That one is about the systems

that read and sync data. This other change is about the systems that send mail. What they share is a common direction: Microsoft is retiring the legacy ways that older software connects to email and replacing them with modern, more secure methods. WHAT THE WORK INVOLVES Finding the exposure at a given site is methodical, but not difficult. The systems that send email can be listed, and each vendor asked one plain question: does this product still sign in with a username and password, and do you support the modern method yet? Microsoft’s own administrative tools confirm which accounts are still using the old way to send mail. The answers sort into three piles: already modern; has an update that needs applying; or old enough that the vendor has no answer, which is the pile that needs a plan before December. THE QUESTION WORTH ASKING NOW Condo budgets are set in the fall, vendors move at their own pace, and most sites have more of these quiet systems than anyone realizes. Corporations should compile a list of what systems send email at their site, and how each system signs in. The date is set. The failure is silent. The window is open, for now. Aaron Lazare is the owner of Toronto Tech, an independent IT advisory firm working exclusively with residential condominium corporations in the GTA. He can be reached at aaron@torontotechguy.com or torontotechguy.com. Fall 2026 |

7


OPERATIONS & MAINTENANCE

Health Officials Tap Water Management Programs

N

ew guidance from Health Canada urges condominium corporations to implement water management programs to guard against microbial growth and chemical contaminant leaching in the plumbing systems of buildings with centralized hot water supply. That’s part of a proposed package of best practices for identifying, managing and monitoring water quality risks that can arise from operational or maintenance conditions in residential buildings. Policymakers aligned with the federal-provincial-territorial committee on drinking water (CDC) have targeted microorganisms that can grow and persist in plumbing systems, and trace metals that can seep into potable water as it is stored and circulated within buildings. Factors such as temperature, flow rates, demand levels, piping diameter and configurations and the age of system components all contribute to the quality of water making its way to residential units. Metals and inorganic substances may arrive via the municipal drinking water distribution system (DWDS) or from the materials that comprise a building’s water tank, pipes and fittings. Microbial contaminants that are naturally present in the environment can amass and proliferate within biofilms that

8

| Fall 2026

are deemed to be “ubiquitous” in residential plumbing piping. Problematic strains such as Legionella, Mycobacterium and Pseudomonas are characterized as “opportunistic pathogens” that typically don’t pose a threat to healthy individuals but can present serious risks for those vulnerable to illness. A draft guidance document currently posted on the Canadian government’s website for public consultation includes advice for drinking water suppliers, owners/managers of multifamily buildings, homeowners and occupants of single-family and low-rise housing, and anyone who consumes or is exposed to the water that flows from residential faucets, aerators, hoses and showerheads. Multifamily landlords and condo corporations are responsible for monitoring and addressing risks related to water distribution, storage and circulation from the point at which municipal supply enters into their properties. “Complete eradication of OPPPs (opportunistic premise plumbing pathogens) is impossible, particularly in complex building plumbing systems where recolonization often occurs. However, steps can be taken to limit growth of OPPPs in plumbing systems to reduce the risks of human exposure,” the guidance states.


OPERATIONS & MAINTENANCE

Infectious outbreaks are typically attributed to a chain of circumstances rather than any one factor, and vigilant risk management practices can interrupt that progression at various points. Health Canada references a series of related ASHRAE standards that contain risk management protocols for physical, chemical and microbial hazards in building water systems and specific applications for Legionella control. Of these, ASHRAE standard 514 sets out parameters for devising a water management program (WMP) — a site-specific, multi-step exercise based on hazard analysis critical control points (HACCP) to identify types, infiltration paths and allowable thresholds of potential hazards, then apply required controls along with monitoring, documentation and verification processes. The guidance endorses that approach, but acknowledges that building owners/ managers will need trained in-house expertise or third-party consultants to introduce and oversee such programs. “For large multi-dwelling residential buildings, there is strong consensus that the development and implementation of a building WMP, also called a water safety plan for buildings, is a best practice to help building owners and managers oversee water quality in their buildings,” it states. “Important challenges with implementing WMPs are the demands for time and financial resources.” OPERATIONAL AND MAINTENANCE MEASURES At a less technical level, the guidance describes the general features of a good plumbing system and suggests operational measures to reduce potential risk exposure. Owners/managers are advised to be particularly vigilant about biofilm and sediment that can nurture microbial growth and the presence of plumbing system components that contain lead. Optimum water temperatures, routine system flushing and communication to building occupants about risk-reducing procedures within their dwelling units should be ingrained in the strategy. Cold water should be delivered at a temperature below 20 degrees Celsius (70⁰ F); hot water should be above 60⁰ C (150⁰ F) at its source and maintained above 49⁰ C (128⁰ F) as it travels through the pipes. Owners/managers should also ensure that pipes are properly insulated to avoid heat loss or gains that could compromise those temperatures, paying particular attention to piping in unheated mechanical rooms, near hot equipment or exhaust outlets and/or on outside walls. The potency of water’s disinfectant agents diminishes as it travels away from the treatment plant and toward a building’s intake, and that process continues over the period that it might sit within the plumbing pipes. As well, there is more opportunity for microbes adhered to the inner surface of those pipes to infiltrate the water supply the longer it idles. The guidance outlines flushing protocol for routine maintenance or more intensive remedial action. Operators should first open the cold water and let it run until freshly delivered-to-the-building water arrives; next, open the hot water and let it run until the temperature stabilizes around 50⁰ C (130⁰ F); then, finally, run the cold water again for approximately 10 seconds. This is a recommended weekly procedure at any outlet that has not been used in the previous seven-day period, and should begin with the outlet nearest to building’s intake point and move outward from there. Flushing is also a short-term mitigation for reducing lead concentration in cold water, but the guidance warns that levels can rise again within 30 to 60 minutes. Replacement of lead-containing plumbing system components is the durable solution. Other recommended maintenance activities include regular draining and flushing of hot water tanks (a task that may require a licensed plumber) and

regular cleaning of showerheads, faucets and aerators to remove biofilm. If manufacturers’ instructions for cleaning the latter items are not available, the guidance cites a procedure considered suitable for Legionella control, which involves: washing in soap and water; descaling, if necessary, in white vinegar or a descaling solution for 30 to 60 minutes; rinsing and soaking in a 50 ppm bleach solution, equivalent to 1 teaspoon of bleach per 4.5 litres of water, for at least 30 minutes; rinsing and reassembling. “In general, features of a good plumbing system design include: having good flow to all parts of the system (for example, minimizing stagnation, avoiding dead ends); avoiding materials that encourage growth of microorganisms or that can be sources of lead; minimizing heat transfer to and from hot and cold water supplies; and ensuring access for cleaning and maintenance of components,” the guidance observes. “Any measures to improve energy efficiency or reduce water usage should be assessed at the design stage to ensure that the control of OPPPs and inorganic contaminants is not compromised.” Concerns about water-efficiency centre on lower flow rates, which can affect the transport of microorganisms and other contaminants and/or add to water volumes idling in the pipes and associated biofilm formation. Meanwhile, the guidance warns that climate change may create conditions that will make opportunistic pathogens more abundant or more resilient within plumbing systems since there are likely to be additional challenges to keep water temperatures below threshold for growth at around 25⁰ C. Health Canada is accepting comments on the proposed guidance until Nov. 24, 2026.

Fall 2026 |

9


SPONSORED CONTENT

The Essentials of Condominium Balcony Restoration P

ersonal outdoor space in condominiums is a highly soughtafter commodity, offering both physical and psychological benefits to residents. A dedicated private balcony not only expands a unit’s livable footprint and increases natural light; it also serves as a quiet retreat for fresh air. However, as a building ages, the need for maintenance often shifts from minor, one-off repairs to a comprehensive balcony restoration project. Deterioration often manifests as cracking, staining, deterioration of finishes, or other visible signs of distress. In concrete structures, moisture, chlorides, and carbonation can contribute to corrosion of the embedded reinforcing steel, which expands and can cause cracking and spalling. In wood-framed buildings, prolonged exposure to moisture can lead to rot. Most high-rise condominiums utilize a cantilever balcony design where a concrete slab extends directly from the building’s internal floor slab without external supports. Conversely, low-rise buildings (four storeys or fewer), often feature balconies made of wood or light-gauge steel that can be either cantilevered or supported on columns or end walls. For either system, maintaining effective draining, through slopes, flashing, and sealant is important to help minimize the risk of deterioration. Railing failure is a critical concern; while minor movement is natural, a wobbly guard should be investigated. The stability of these railings can depend on the strength of the concrete into which they are installed, making this a primary concern if concrete deterioration is present. Further, falling debris from balconies presents a risk to pedestrians and residents on lower floors as spalling concrete or rusted metal breaks away.

Initiating a comprehensive balcony restoration project can feel daunting — especially when you are balancing multiple projects — but it doesn’t have to be that way. The following knowledge and practical guide can be used to help ease you through the process. CONTRACT AWARD AND IMPACT ON RESIDENTS Transitioning into a construction project can be stressful for residents, making clear communication an essential tool in establishing confidence. The time between a tender closing and physical work beginning can vary greatly depending on contract negotiations and final approvals. Residents will be anxious to have the work completed and return to confidently using their outdoor space. This time can be used to express the prep work expectations from all building occupants. In preparing for work to begin, residents must completely clear their balconies. It is the resident’s responsibility, not the contractor’s, to remove personal belongings. Building management must communicate this effectively, and in some cases, provide accommodations for those residents who may not be physically able to complete this themselves. Once cleared, balconies must remain closed for the duration of the project, and proper signage should be displayed on balcony doors to remind occupants that the area is out of bounds. DURATION AND STAGES OF THE WORK Once balconies are cleared and the required access equipment is set up, work can begin. However, it is important to communicate to residents that balcony restoration typically involves a series of


SPONSORED CONTENT

MANAGING DISRUPTION AND DELAYS The most common complaints during restoration involve noise and delays. All parties need to understand the agreed upon work hours and how weather can affect the project. For example, rain, wet surfaces, high winds, and extreme temperatures can all limit certain aspects of the project and lead to schedule delays. In the same manner you would include a cost contingency in a contract; project schedules should include weather contingencies to account for unpredictable conditions.

stages, where one stage must be completed and reviewed before the next can begin: 1. Firstly, where needed, the existing guards are removed, and the Consultant and Contractor work together to identify the areas of concrete requiring repair. 2. Next, deteriorated concrete is removed and the areas are prepared. An inspection is then completed to ensure the surface is appropriately ready for the new concrete.

RESIDENT COMMUNICATION Regular communication to residents on the status of the project and the reason for any delays is fundamental to any construction project. Residents should be updated regularly, even if the news is simply that the project is progressing as planned. It is also important to explain phased completion (or “drops”), where some balconies may remain closed for technical reasons even if they appear finished while others are opened. A restoration project is considered successful when safety and performance concerns are addressed, and residents can regain use of their outdoor spaces. By prioritizing proactive inspections, using appropriate repair materials and methods, and maintaining transparent communication, condominium corporations can ensure their balconies are a source of value and enjoyment for years to come. Pretium Engineering has over twenty years of experience in balcony restoration and construction projects. They proudly serve building owners and managers from locations throughout the GTA.

3. Once the repairs are complete, the new concrete needs time to cure and dry before waterproofing is applied (when included in the project scope). 4. Coatings or waterproofing also require time to cure before any subsequent work can proceed. 5. Once the waterproofing is complete, the new balcony guards are installed. 6. With the balcony guards in place, a final inspection is completed to identify any deficiencies. Once these are corrected, the balconies can be returned to the residents for use.

To learn more, visit www.pretiumengineering.com


LEGAL

Superior Court Confirms Amlani Ruling Condominium corporations cannot charge back and lien for legal costs incurred in enforcing compliance. By Jake Fine

12

| Fall 2026


LEGAL

I

n 2020, the Court in Amlani v.York Condominium Corporation No. 473 (Amlani) ruled that a condominium corporation cannot charge back and lien for legal costs incurred in enforcing compliance with a condominium corporation’s declaration without a court order under section 134(1) of the Condominium Act, 1998 (the Act). Section 134(1) of the Act permits a condo corporation to apply to the Superior Court of Justice for an order enforcing compliance with the Act, or the condominium corporation’s declaration, the bylaws or the rules (a compliance order). A condominium corporation must first obtain a compliance order before it can rely on s. 134(5) of the Act, which allows it to add the court-awarded costs, plus any other actual costs incurred in obtaining that order, to the owner’s common expenses. The underlying reasons for the result in Amlani are expressed in the following excerpt: [34] It is one thing to allow the corporation to enforce, by way of lien, common expenses that are applicable to all unit holders and that a majority of unitholders have approved. It is entirely another to allow a condominium corporation the unfettered, unilateral right to impose whatever costs it wants on a unitholder, refer to them as common expenses and thereby acquire the right to sell the unitholder’s apartment. [Emphasis added.]

After the arrears went unpaid, the corporation issued a notice of lien and an accompanying letter, which were inconsistent about what amounts were covered under the lien. The notice of lien noted costs that only related to the second lawyer’s letter, while the accompanying correspondence referred to the costs of both letters and the fire safety charge. The applicants sought to have the lien discharged. THE DECISION The Court ruled in favour of the applicants and discharged the lien. While the judge did consider and note the difference between the indemnity provisions in Amlani and this newer case, the judge ultimately ruled that the reasoning in Amlani was applicable. In reaching this decision, the judge determined that any declaration

In Amlani, the condominium corporation relied on an indemnification provision in the declaration with wording that is found in many older condos: “an act or omission to or with respect to the common elements and/or all other units”. The court found that the board’s interpretation of the indemnification provision was unreasonable and justified judicial intervention. Lawyers within the industry thought that a case with the right facts and the right indemnification provision within a condominium corporation’s declaration could produce a decision that overruled Amlani. Now, in 2026, the Superior Court in Chiarelli v. Toronto Standard Condominium Corporation No. 2339 (Chiarelli) clarified that this is not the case. THE FACTS In Chiarelli, the condominium corporation registered a lien against the applicants’ unit for $3,634.62, based on two chargebacks. The first chargeback arose from two demand letters the corporation’s lawyers sent in 2023 and 2024 with respect to the applicants’ use of their unit as a short-term rental in breach of the declaration’s three-month minimum lease term. The corporation relied on a broad indemnity provision in its declaration that deemed as common expenses, any costs arising from an owner’s breach of the governing documents. The second chargeback was a $99.95 charge for replacing a smoke/carbondioxide detector identified during a 2022 fire inspection. Fall 2026 |

13


LEGAL

“The rulings in Amlani and Chiarelli will also require condo corporations to reconsider how they enforce their governing documents.”

provision, regardless of its wording, that permits a condominium corporation to add the legal costs in enforcing compliance to a unit’s common expenses, is inconsistent with section 134(5) of the Act. If a declaration alone could authorize a condominium corporation to do this, then section 134(5) would be meaningless as a corporation would not be required to first obtain a compliance order. In other words, a condominium corporation cannot be judge, jury and executioner in enforcing compliance and a court order is required to allocate legal costs to a unit’s common expenses. This reinforces the broader principles that a condominium corporation’s declaration must be consistent with the Act and cannot be used to circumvent its requirements. It also confirms that any interpretation of a declaration by a condominium corporation that contravenes the Act is not enforceable. The condominium corporation attempted to argue that even if the legal costs issue was dismissed, that the lien was still valid with respect to the fire

14

| Fall 2026

safety costs. This argument was also rejected by the Court. In particular, the judge ruled that the notices provided to the owners were fundamentally flawed and misleading and, as a result, did not provide a justification for the lien. THE UPSHOT This decision confirms that no matter how clearly a declaration is worded, a condominium corporation cannot lien for legal costs in securing compliance without first obtaining a court order under section 134 of the Act (or an award from the Condominium Authority Tribunal). Condominium corporations may still be able to collect these costs in small claims court, however, as cost awards there are generally capped at 15 per cent of the value of the claim, the costs in pursuing the claim, among other factors, should be weighed against the amount to be recovered. The rulings in Amlani and Chiarelli will also require condo corporations to reconsider how they enforce their governing documents. Condominium corporations have a legal obligation under the Act to take reasonable steps to enforce compliance, and intervention by legal counsel is usually necessary only after the corporation’s enforcement attempts have failed. As a result, the legal costs incurred in carrying out this legal obligation may need to be considered a cost of doing business. Finally, condominium corporations should also ensure that any notices related to chargebacks are clear and consistent. Any ambiguity, misleading or incorrect statements, or confusion caused by a notice could result in an otherwise valid chargeback and subsequent lien to be voided. Jake Fine is a Partner with Lash Condo Law.


Condominium management your board can rely on

Visit: bit.ly/lifesimplified-ON

As summer winds down, condominium boards shift focus to budgets, maintenance, and planning for the future. With more to manage, clarity and foresight matter. To succeed, you need more than management. You need a partner who brings confidence and consistency to every decision. Our locally rooted teams combine deep Ontario expertise with the strength of a market leader, delivering the insight and support your board needs to stay ahead. Step into the next season with confidence. Say hello to, Life, simplified.

fsresidential.com/ontario

Discover what better support looks like.


SPONSORED CONTENT

HOW MANY SYSTEMS DOES IT TAKE TO MANAGE A CONDO PORTFOLIO?

C

ondominium management has become increasingly complex: today’s property managers do far more than collect condo fees, pay invoices, and produce financial statements. They manage maintenance, communicate with boards and owners, administer payments, oversee vendors, maintain documents, manage amenities, track compliance, and provide information across entire portfolios. Technology was supposed to make this easier, yet, for many condominium management companies, technology itself has become part of the complexity. Managers may need to move between accounting software, resident portals, maintenance applications, payment platforms, document repositories, and other specialized systems.

HOW MANY SYSTEMS DOES IT TAKE TO MANAGE YOUR CONDO PORTFOLIO? The answer can reveal whether technology is helping a management company grow or adding complexity to its operations.

THE TRADITIONAL APPROACH: BUILD A TECHNOLOGY STACK Many established property management environments have evolved by adding products and modules for different

operational requirements. Consider Yardi, featuring Voyager, its property management and accounting platform, at the centre – and organizations can add other Yardi products for additional capabilities.

YARDI: VOYAGER + CONDOCAFE + MAINTENANCE IQ + PROCURE TO PAY + PAYMENT SERVICES + ADDITIONAL CONFIGURATION OR SOLUTIONS Voyager provides core property management and accounting, while CondoCafe adds owner and residentfacing capabilities. Maintenance IQ extends maintenance operations, Procure to Pay supports purchasing and accounts payable, and Payment Services adds transaction capabilities. These products operate within the broader Yardi ecosystem, but organizations may still implement, configure, and administer multiple products to obtain the functionality they require. Other software approaches can create similar considerations. But whether a company uses Yardi, Shiftsuite, Condo Control, Condo Manager, or other products, the question remains: how many applications does your team need to accomplish its daily work?

PROPERTY MANAGEMENT. ACCOUNTING. MAINTENANCE. ELECTRONIC PAYMENTS.


SPONSORED CONTENT

INTEGRATION IS MORE THAN CONNECTING APPLICATIONS There is an important difference between integrated applications and an integrated operating platform. Connected applications can exchange information, but each may still have its own configuration, workflows, permissions, training requirements, and user experience. UpperBee takes a different approach. UpperBee Manager was designed from the start to bring property management, accounting, and the day-to-day operations of professional condominium management together within one environment. Instead of starting with an accounting system and adding applications around it or starting with a resident portal and connecting it to accounting, UpperBee brings all the different sides of condominium management together. Accounting connects to property operations. Owner communications connect to owner records. Payments connect to accounting. Documents, financial information, resident self-service, workflows and portfolio information operate within the same environment.

ONE PLATFORM INSTEAD OF A TECHNOLOGY STACK: UPPERBEE MANAGER Within UpperBee Manager, property managers can bring together property management, accounting, electronic payments and receivables, budgeting, financial reporting, maintenance, owner communications, service requests, document management, amenity reservations, board and owner management, rules and violations, and portfoliolevel management. UpperBee is not simply another application to add to a property management technology stack; it is designed to replace the need for much - if not all - of that stack. That can mean fewer systems to administer, fewer integrations/ interfaces to maintain, fewer places to enter information, and fewer applications employees need to learn. More importantly, information entered once can become useful throughout the organization. A service request can become part of a maintenance workflow. A financial transaction can flow into reporting. Owner information can support communications and self-service. Management can gain portfolio-wide visibility without assembling information from multiple systems.

which system represents the single source of truth. Consider a manager responding to an owner’s inquiry. Financial information may be in the accounting system, the owner’s request in a portal, an invoice in an AP application, and maintenance information somewhere else. Each application may work well. The inefficiency is the space between them. UpperBee’s advantage is not simply that it performs individual functions; it is that those functions operate as parts of the same property-management environment.

TECHNOLOGY THAT SCALES WITH THE MANAGEMENT COMPANY This becomes increasingly important as portfolios grow adding properties should not automatically mean adding equivalent administrative complexity or continually adding staff simply to manage more transactions, communications, and systems. A scalable platform should allow a management company to gain leverage by increasing the number of properties it manages while improving the productivity of the people already managing them. Managers spend less time moving between applications, accounting, and operations work from connected information, owners gain greater self-service capabilities, and executives gain portfolio-wide visibility.

HAVE YOU OUTGROWN YOUR SOFTWARE - OR YOUR SOFTWARE STACK? The warning signs are familiar: employees maintain spreadsheets to compensate for software limitations, enter the same information multiple times, constantly switch between applications or create manual processes to connect systems. At that point, the problem may no longer be any single application, the problem may be the technology stack itself. The question is no longer simply: Does our existing software still work? Better questions are: How many systems does it take to run our business? How much work are we doing because those systems are separate? Could one integrated platform do it better? For professional condominium management companies, that is the difference UpperBee Manager was designed to deliver.

THE HIDDEN COST OF MULTIPLE SYSTEMS Software licensing is only one component of technology’s true cost: every additional application can introduce another implementation, configuration, integration, and user interface. Permissions must be maintained, employees trained, and integrations monitored. Management must also determine

One platform. One experience. UpperBee Manager. www.upperbee.com

COMMUNICATIONS. OWNER SERVICES. REPORTING. PORTFOLIO MANAGEMENT.


GOVERNANCE

Making Committees Work Extending the board’s reach while avoiding blurred lines of authority.

By Val Khomenko Uttering the word “committee” in a condo boardroom often garners quiet enthusiasm from directors who know exactly how much work it can take off their plate, or a faint wince from anyone who’s sat through a wallpaper colour debate that ran fortyfive minutes past its allotted ten. Committees have a reputation problem. But set up properly, they’re one of the most effective governance tools available to an Ontario condo corporation. They serve as an advisory extension of the board’s capacity, not a direct rival to its authority. 18

| Fall 2026


GOVERNANCE

H

ere’s a practical look at what committees are, why they’re worth the effort, and how to keep them working the way they’re supposed to. WHAT A COMMITTEE REPRESENTS In Ontario, a condo committee is a group of people, usually a mix of board members, residents, or both, who get together to focus on one specific area so the board doesn’t have to become instant experts in everything from landscaping contracts to elevator modernization. In comparison, the board is the executive team and committees are the specialized departments that feed them information, recommendations, and the occasional strongly worded opinion. Committees don’t have decision-making power. Under the Condominium Act, 1998, only the board of directors can bind the corporation. A committee can research, gather quotes, interview contractors, and arrive with a well-organized recommendation, but it cannot approve spending, sign contracts, or change the rules on its own authority. That stays with the board. Committees advise; boards decide. Getting this distinction on the record early saves a lot of confusion down the line for the committee, the board, and the manager caught in the middle.

Social Committee: Plans events and building activities, and is quietly responsible for more owner goodwill than any newsletter ever will be.

these committees. A committee should exist because there is real, ongoing work to support, not because it looks good on an agenda or it’s in the interest of a few.

Landscaping/Grounds Committee: Keeps an eye on maintenance standards, seasonal work, and the fate of that one tree everyone has opinions about; considered the most powerful and influential committee type.

THE CASE FOR USING THEM A few reasons committees earn their keep: They distribute the workload. Directors are volunteers with full lives outside the board meeting. Committees let specialized work get shared instead of falling on two or three people.

Rules & Bylaws Committee: Reviews and proposes updates to governing documents, ideally before a gap in the rules becomes a legal issue. Welcome Committee: Helps new owners get oriented, which cuts down on the “nobody told me” calls later. Not every building needs all or any of

1

2

They tap into expertise owners already have. An accountant on the finance committee, a former event planner on the social committee — buildings are full of relevant skill sets that rarely get used unless there’s a structure to plug them into.

THE USUAL LINEUP Every building is unique, but a few committee types show up again and again: Finance Committee: Works through budgets, reserve fund studies, and the annual exercise of explaining insurance premiums to a skeptical audience. Fall 2026 |

19


GOVERNANCE

“Committees advise; boards decide.”

3

They increase owner engagement. Owners who feel involved tend to be more understanding of board decisions (gradually), more communicative, and less likely to save every grievance for the AGM.

4

They improve the quality of information reaching the board. A well-run committee hands directors a researched recommendation instead of a blank slate.

Expertise. Insight. Trust. Mechanical Electrical Sustainability Decarbonization

SETTING ONE UP WITHOUT LOSING CONTROL OF IT A committee works best with a clear mandate, a defined scope, and a built-in end point or review date. Not every committee needs to exist indefinitely. One committee call to evaluate three landscaping bids can dissolve once a recommendation is made; a social committee may run on an ongoing basis simply because the work never stops, unless the budget is tight that year.

Having the technical expertise and insight to conduct retrofit projects in established buildings without affecting the day-to-day business of occupants is our specialty. It’s what sets us apart. The truth is, existing buildings are far more complex and challenging than new construction, and require a unique game plan every time. It’s why the process for delivering mechanical and electrical engineering solutions requires more than a cookie cutter approach – it demands that you have a deep insight into the building and how new systems can be integrated into existing systems seamlessly.

Electric Heat Pump Boiler

Gas Condensing Boiler

T: 416-443-9499 | E: marketing@mcgregor-allsop.com | mcgregor-allsop.com 20

| Fall 2026

All of our projects are reviewed by senior engineers, each with over 30 years of experience in their respective fields, ensuring that our clients always receive engineering services of the highest quality.


GOVERNANCE

It’s worth putting the mandate in writing: what the committee is responsible for, who it reports to, how often it meets, and what falls outside its authority. This isn’t paperwork for its own sake; it’s what keeps a committee from drifting into decisions that were never theirs to make.

WHERE COMMITTEES TEND TO GO SIDEWAYS A few predictable failure points are worth watching for: Scope creep: a landscaping committee that starts weighing in on reserve fund allocation. No clear reporting line: recommendations that never actually make it to a board table. Enthusiam outpacing structure: committee members who lose sight of the “advisory” part of the role. None of this makes committees more trouble than they’re worth. It just means they work best with a light governance structure underneath the goodwill. THE BOTTOM LINE Used well, committees are one of the more effective tools available in condo governance. They extend the board’s capacity, bring owner expertise into the process, and produce better-informed decisions. Used poorly, they produce long meetings and blurred lines of authority. The ultimate difference comes down to clarity: define the mandate, keep the reporting line clean, and let committees do what they do best: support the board, not replace it. Val Khomenko, RCM, OLCM, is Director of Condominium Management with TSE Management Services Inc., providing full-service property management and consulting services in the Greater Toronto Area. Fall 2026 |

21


SPONSORED CONTENT

WHEN AGING CONDO HVAC SYSTEMS NEED REPLACING, PLANNING MAKES ALL THE DIFFERENCE

A

cross the Greater Toronto Area and other major urban centres, thousands of through-the-wall heating and cooling systems installed during the real estate boom of the 1990s and 2000s are reaching the end of their service lives. These all-in-one systems were a popular choice in condominium construction because they conserved valuable interior space while giving residents control over their in-suite heating and cooling. However, decades later, condominium boards, property managers, and owners are now facing the challenge of repairing or replacing aging equipment. For many, this is proving difficult. As original equipment reaches 20 years of age or more, replacement parts become harder to source, while legacy manufacturers or entire product lines may no longer exist. Skymark International, formerly based in Ajax, Ontario, produced through-the-wall heating and cooling equipment that was commonly installed in multi-residential buildings for years. With original parts now increasingly difficult to source, owners and contractors are often left deciding whether to continue repairing aging systems or consider replacement. Ryan Schlarb and Stephanie Papatheodorou, co-owners of Bradford, Ontario-based Parlay HVAC Solutions, have spent years working with contractors, property managers and building owners facing exactly this problem. “Property managers and owners were often told to keep repairing these systems because there were not many practical replacement options,” explains Schlarb. “As the equipment gets older, that becomes harder to justify, especially when major components can cost several thousand dollars.”

Looking Beyond Equipment Price Replacing through-the-wall HVAC equipment in an occupied condominium is very different from installing equipment in new construction. Space constraints, narrow doorways, finished walls, cabinetry and occupied suites can turn what appears to be a straightforward equipment replacement into a much larger construction project. This is where looking only at the equipment price can be misleading. “Property managers and boards need to look at the complete installation,” Papatheodorou explains. “What has to be removed? What has to be rebuilt? How long is the resident going to be disrupted? Those costs can become much more significant than the difference between two pieces of equipment.” Schlarb agrees that evaluating the complete project cost is critical. “The equipment is only one part of the replacement cost. Labour, access, demolition, reconstruction, and the amount of time spent working inside an occupied suite can all have a major impact on the economics of the project. Sometimes a replacement that appears less expensive on paper can become considerably more costly once you look at everything required to make it work.”

A Modular Approach to Legacy Replacement Through its relationship with Bradford-based Ranger Heating & Air Conditioning Products Inc., Parlay HVAC Solutions offers the RANGERPAK, a purpose-built replacement platform designed around the existing wall openings and system configurations commonly found in legacy Skymark and Fedders installations. The RANGERPAK is designed as a modular system consisting of


SPONSORED CONTENT

three major, manageable components for installation. Rather than forcing a large, single-piece unit through a finished condominium suite, technicians can move the individual sections into place and assemble the replacement within the existing mechanical space. The modular design also allows the platform to accommodate multiple legacy equipment layouts and configurations without requiring a completely different replacement platform for each application. Both the through-the-wall condensing section and furnace are Canadian-made, and the modular design allows the components to be configured around different installation requirements, including lefthand and right-hand layouts. This helps simplify equipment selection for contractors and distributors while providing greater flexibility when replacing legacy systems across a building. But Schlarb believes contractor education and technical support are equally important as the equipment itself, particularly when a service team encounters a legacy system or replacement configuration for the first time. Parlay provides contractors with step-by-step installation resources, including video training and technical documentation. On larger building-wide replacement projects, technical support can also be provided during the initial installations to help the contractor establish a repeatable process for the remaining suites. “If a contractor is replacing equipment they have never worked on before, we want to help them get that first installation right,” says Schlarb. “Once they understand the system, the rest of the building becomes much more predictable.”

Planning Before the Emergency For condominium boards and property managers overseeing aging equipment, Parlay recommends understanding the available repair and replacement paths before failures become emergencies. Having those conversations earlier gives buildings more control over the process, Papatheodorou suggests. “That does not necessarily mean committing to replacing an entire building at once,” she says. “It means knowing what is installed, understanding which units are giving you problems, what your replacement options are, and having a path forward before the next failure happens.” For some buildings, that may mean developing a longer-term replacement strategy in which equipment is addressed progressively as failures occur, or as capital budgets allow. Having an established replacement path can help avoid having to start the research and decision-making process from scratch each time a unit fails. Regular spring and fall inspections can also help to pinpoint deteriorating equipment before peak heating or cooling seasons. Just as importantly, management can begin documenting the existing equipment population, identifying common models and configurations, and the replacements available. Planning ahead can also help condominium boards evaluate the complete project cost rather than looking only at the purchase price of the equipment. Installation requirements, restoration work, access, resident disruption, future parts availability and contractor familiarity can all materially affect the long-term cost of a replacement program.

A Growing Legacy-Equipment Challenge As multi-residential buildings constructed during the real estate boom of the 1990s and 2000s continue to age, the challenge of supporting obsolete and discontinued HVAC equipment will become increasingly common. At the same time, replacement equipment continues to evolve, including new refrigerant requirements and updated technologies. “Our role is to help property managers, contractors and owners understand what they have, what their realistic options are, and develop a replacement strategy before they are forced into one,” says Schlarb. RANGERPAK equipment is manufactured in Bradford, Ontario, by Ranger Heating & Air Conditioning Products Inc. Parlay HVAC Solutions serves as Ranger’s manufacturer’s representative, providing application assistance, contractor training and technical support across Canada and the United States. Connect with the experts at Parlay HVAC Solutions today to assess your building’s current equipment setup and develop a customized HVAC replacement roadmap. www.parlayhvacsolutions.com.

The RANGERPAK; a purpose-built, modular replacement solution for legacy through-the-wall HVAC systems.


LEGAL

Reserve Fund Planning Tips How to move from a reactive to an intentional approach. By Laura Gurr and Megan A. Alexander

U

nit owners often expect the reserve fund study to be a definitive statement of the costs that will be incurred over the next three years. Reserve fund contributions are based on expected repair and replacement costs, the anticipated life of the corporation’s assets and the requirement that the fund remain adequate. While reserve fund planners are very knowledgeable and skilled at what they do, the reserve fund study is not a guarantee that reality will be consistent with the plan. As managers and board members are acutely aware, construction costs continue to vary be-

24

| Fall 2026

tween the date a reserve fund plan is developed and the date a project is tendered. This variance can be significant. There can also be unanticipated increases in the scope of a project, or items that must be repaired or replaced earlier than anyone anticipated. Even where a board follows all of the best practices, relies on qualified professionals and plans carefully, the unfortunate reality is that the reserve fund may not be sufficient to meet the actual cost of the work. Intentional planning, therefore, means treating the reserve fund study as a governance document, not simply a compliance document, while also recognizing that it is a


LEGAL

forecast rather than a crystal ball. In many corporations, the challenge is not identifying that major repair and maintenance work is needed, or identifying the reasons that the actual costs have exceeded the amount planned for in the reserve fund study. The challenge is deciding when to begin the conversation with owners. Intentional planning does not eliminate hard conversations. Bad news does not often get better with time. When a special assessment, increase in common expenses, or a loan becomes necessary, the board should resist the temptation to delay the conversation because this almost always in-

vites frustration. Delays can also create liability for the corporation. When these hard conversations are delayed, the discussion is no longer only about the building but also about assigning blame, feelings of distrust for the board, and concerns about whether the board is not being transparent with owners. If the information is not disclosed in a status certificate, this can also create liability for the corporation. A better approach is to be transparent with owners as soon as the board is aware of the need for the work and that the costs are likely to exceed the amount set aside in the reserve fund. The

board should explain the problem in sequence: what physical condition has changed, what professional advice the board has received, what work is required, what funding options have been considered, and why the board has selected the proposed approach. Owners are still likely to be unhappy with the financial impact, but the discussion is less likely to become personal or accusatory when the board can prioritize transparency and show the reasoning behind the decision. The reserve fund study should also be connected to the corporation’s broader long-term strategy. It is not enough to receive the study, approve a funding plan and then return to it three years later. Boards should use the study as a standing governance tool. That means comparing the study against current conditions of the common elements, pending capital projects, construction cost volatility, borrowing capacity, common expense increases and owner tolerance for financial disruption. Where the board knows that major work is likely to arrive earlier than projected, or that costs have moved materially since the study was prepared, the issue should be addressed before the corporation is forced into a crisis-driven decision. Communication is most effective when it is candid, timely and tied to the board’s statutory obligations. The purpose is not to persuade every owner to agree with the board. That may not be realistic, particularly where the financial impact is significant. The purpose is to reduce the sense that the decision has come from nowhere. Owners are less likely to view a special assessment, request for a loan, or significant increase in fees as arbitrary if they have full and transparent communication. A practical board message to the owners might be: “We know this is difficult news. The board did not arrive at this recommendation lightly. The work is required because of the condition identified by our professionals, the timing is driven by the risk of further deterioration, and the amount is based on the funding options available to the corporation. We are providing the information Fall 2026 |

25


FINANCE

responsible governance. Ultimately, intentional reserve fund planning is not simply a budgeting exercise. While special assessments, loans, or substantial increases to common expenses may never be welcomed, they are less likely to become sources of serious and prolonged conflict when owners can understand how the board moved from identifying a problem to selecting a solution.

we relied on so owners can understand the path from the reserve fund study to this decision.” That type of message does not make the costs easier for owners in difficult financial circumstances, but it does make the process more transparent. Transparency is often the difference between an unpopular decision that prompts requisitions and personal accusations against board members and an unpopular decision that owners can understand as unavoidable and the result of

SMART FOR BOARDS. LOVED BY RESIDENTS. Reduce yearly costs while upgrading rooftops, terraces, and common areas! No mowing. No watering. No mess. Just clean, durable turf all year round.

SCAN HERE TO GET A QUOTE! 1.888.622.5296 lazylawn.ca

26

| Fall 2026

Laura Gurr is a partner with Cohen Highley LLP in London. Cohen Highley LLP has offices in London, Kitchener, Windsor, Strathroy and Sarnia. Laura provides risk management and regulatory compliance advice to condominium corporations, unit owners, and property management companies. Megan A. Alexander is a licensed paralegal who works within the Commercial Litigation and Multi-Residential Housing Groups at Cohen Highley LLP in London, Kitchener, Strathroy and Windsor. Ms. Alexander’s main areas of practice are within the Ontario Small Claims Court (including enforcement) and the Condominium Authority Tribunal (CAT).


PERFORMANCE BEYOND THE SURFACE

ASPHALT PAVING SNOW REMOVAL SERVICE LANDSCAPE CONSTRUCTION estimating@forestgroup.ca service@forestgroup.ca

SITE SERVICING BUILDING RESTORATION CONCRETE CONSTRUCTION 24 Hour Emergency Service 416.524.3000

forestgroup.ca


TAK


KING ‘CHARGE’ OF SAFETY The concern over lithium-ion batteries has been a legitimate conversation grappling the condo industry over the past year. In this series of articles, legal and engineering experts discuss the fire risks and potential solutions for mitigating what is becoming a serious problem in high-rise buildings, including underground parking garages.


FEATURE

Lithium-Ion Batteries: Fire Risks and Condo Rules By James Davidson and Nancy Houle

L

ithium-ion batteries are causing more fire incidents in multi-residential buildings. As governments, businesses, and consumers transition away from fossil fuels and related greenhouse gas emissions, these batteries are the prominent form used in most electric vehicles, e-bikes, smartphones, laptops, power tools, and countless other devices. They offer concentrated and relatively lightweight storage of electricity, have a long service life, can be recharged thousands of times, and mostly operate safely and reliably. However, failures do occur with serious resulting risks. This past April, Toronto Fire Chief Jim Jessop reported that a lithium-ion battery failure for an e-bike caused a serious balcony fire at a multi-residential highrise in downtown Toronto. Jessop said the incident underscores the risks associated with these batteries and the hazards 30

| Fall 2026

that firefighters encounter during emergency response. He also said that e-bike batteries had become the “largest growing fire safety risk” in Toronto. According to a City of Toronto news release in July 2025, fires caused by lithium-ion batteries increased 162 per cent between 2022 and 2024. More recently, as of October 7, 2026, there have been 108 incidents in the city this year, according to Toronto Fire Services. Condominium corporations are recognizing the steps needed to manage these risks.

cells may explode or reignite even after the initial fire appears to have been extinguished. Battery fires may result from several factors, including: • Manufacturing defects; • Physical damage or punctures; • Exposure to excessive heat; • Improper charging practices; • Use of incompatible or counterfeit chargers; • Overcharging or deep discharging; and • Aging or degraded battery cells.

UNDERSTANDING THE RISKS The primary safety concern associated with lithium-ion batteries is the potential for “thermal runaway” — a chain reaction that occurs when a battery cell overheats. Once initiated, thermal runaway can generate intense heat, toxic gases, and fires that can spread rapidly. In some cases, battery

The growing popularity of e-bikes and escooters has increased the concerns regarding lithium-ion battery safety. E-bikes and scooters often contain large battery packs that are charged inside apartments, storage rooms, hallways, parking garages and exclusive-use areas. In some cases, batteries may be modified, repaired,


FEATURE or assembled using non-certified components, resulting in significant added risks. SERIOUS CONCERNS IN MULTIRESIDENTIAL BUILDINGS Residential buildings concentrate large numbers of occupants within a relatively confined space. A fire originating in a single apartment can quickly threaten neighbouring units and common areas. Because lithium-ion battery fires can develop rapidly and produce substantial amounts of heat and smoke, occupants may have limited time to evacuate. The toxic gases released during battery failures may also spread through ventilation systems and common corridors. Another risk is the increasing use of personal mobility devices, including e-bikes, and electric scooters, which has created new challenges for building managers. Charging activities often take place inside residential units or in exclusive-use areas, where improper charging practices are difficult to detect. Lithium-ion battery fires can be difficult to extinguish using conventional firefighting methods. Even after suppression, damaged batteries may reignite hours or days later, creating ongoing safety concerns for emergency responders and property managers. WHAT CAN CONDOMINIUM CORPORATIONS DO? Despite these concerns, lithium-ion batteries can be used safely when proper precautions are taken. Key safety measures include: USE CERTIFIED PRODUCTS Residents should only purchase batteries, chargers, and electric mobility devices from reputable manufacturers and ensure that products have been tested and certified by recognized safety organizations. Low-cost or counterfeit batteries can lack critical safety features.

ONTARIO TO CODIFY LITHIUM-ION BATTERY HAZARDS Proposed changes to Ontario’s Fire Code introduce new rules for the safe handling of lithium-ion batteries and micromobility devices, such as electric bikes and scooters, that contain them. This would give municipal fire prevention officers authority to address battery-related fire hazards in multifamily and commercial buildings, and enable an additional set of fines for non-compliance in municipalities that opt to invoke administrative penalties. As outlined on the provincial regulatory registry, the Fire Code would be amended to prohibit charging, parking or storage of micromobility devices and/or their lithium-ion batteries in public corridors, lobbies encompassing an exit to the outdoors or near any other exit. Another proposed provision would prohibit any commercial activities involving lithium-ion batteries in residential occupancies — including charging, display, storage, parking, retail, recycling or disposal of either batteries or associated micromobility devices. As well, businesses conducting any of those activities at a commercial or industrial property would be required to inform the local chief fire official. It’s proposed that existing business operators would have 15 days to do so once the new regulations come into force, while new business would be expected to do so before commencing operation. Motorized wheelchairs, medical scooters, shopping carts or golf carts would not be designated as “powered micromobility devices” for the purpose of the regulations. However, general rules for the handling of lithium-ion batteries would apply. These would clarify that batteries must be charged and used in accordance with the manufacturer’s instructions; must not be altered; and must be disposed of properly. The proposed new rules would be enforced under Ontario’s Provincial Offences Act, but the government is also considering giving municipalities leeway to charge additional administrative penalties that could serve as a “progressive enforcement tool”. A regulation of Ontario’s Fire Protection and Prevention Act already enables the penalties for a list of designation contraventions. That fee schedule imposes a $200 fine for a first-time violation. Repeat offences within three years of the first occurrence merit a second-time fine of $400 and a $600-penalty for all subsequent incidents.

teries should not be left charging unattended for extended periods or overnight. Early detection of overheating, unusual odors, smoke, or swelling can prevent a small problem from becoming a major emergency. SAFE STORAGE Batteries should be safely stored, in accordance with manufacturer’s instructions.

SAFELY DISPOSE OF DAMAGED BATTERIES Damaged batteries should not be used.

PASS RULES Rules can serve a number of important purposes: (1) Educating residents (about safe charging and storage of batteries); (2) Allowing the condominium corporation to take enforcement steps in cases where violations come to the corporation’s attention; and (3) Possibly placing responsibility / liability upon any resident who contravenes the Rule. [This in turn may increase the likelihood of compliance.]

SAFE CHARGING Batteries should be charged in proper locations, away from combustible materials and from fire routes. Furthermore: Whenever possible, bat-

The Rules can include the following: • Use only manufacturer-approved batteries and chargers; • Charge on a non-combustible surface.;

FOLLOW MANUFACTURER INSTRUCTIONS Batteries should only be charged using the charger supplied or recommended by the manufacturer. Users should avoid modifying batteries or attempting repairs unless performed by qualified technicians.

• More generally: Keep batteries away from combustible materials; • Avoid charging damaged, swollen, or wet batteries; • Provide adequate ventilation during charging; • Whenever possible, do not leave batteries charging unattended for long periods, especially high-capacity batteries such as those used in e-bikes, scooters, and power tools; and • More generally, follow manufacturer’s instructions for charging and storage. Lithium-ion batteries are useful, important pieces of equipment in our modern society, but they bring risks, particularly from unsafe charging and storage. More condo corporations are becoming aware and passing rules to control these risks, which can particularly help in educating residents. James Davidson and Nancy Houle are partners at Davidson Houle Allen LLP Condominium Law. dhacondolaw.ca. Fall 2026 |

31


FEATURE

Selecting Certified Products & Safe Battery Disposal

By Sally Thompson For years, rechargeable products would generally be purchased from reputable vendors, whose purchasing agents would ensure that the chargers, and products with built-in chargers, met Canadian standards. But today, with the proliferation of online shopping, consumers can buy almost anything from almost anywhere. Rechargeable batteries are installed in thousands of products: toys, healthcare, tools, and of course, e-bikes and e-scooters. It is so tempting to buy the latest gadget at the lowest price, but we can no longer trust vendors to protect our families and buildings from fire. We have to protect ourselves. 32

| Fall 2026


FEATURE

C

anada has strong testing agencies in place and one of its roles is to minimize risk. Buying uncertified products means that you have entered the wild west. But many products appear to be labeled with what looks like a certification, making it very confusing. Some even include the appropriate logo, but are, in fact, counterfeit. In Canada, under the jurisdiction of the Electrical Safety Authority, the approved certifications for chargers, and charging blocks, are CSA, cUL, cETL, and CTUV. They have specific logos that must be used on the product. Each of the symbols will be accompanied by a control or listing number, also printed on the product, usually below the label. All three testing agencies have free online directories where you can check that the information on the label aligns with a listing. These directors can be found at the following links: Product iQ | UL Solutions; CSA Group Product Listing – CSA Group; and Intertek ETL Listed Directory.

Many products online are marked with a CE logo, which is a European certification. However, this mark is not approved in Canada. The CE mark does not imply any third-party testing, and it relates to a 230V power grid, which is different from our 120V Canadian grid. Currently in Canada, certification is only required for products that connect directly into the grid. In the case of rechargeable equipment, this is limited to the charger or charging block only. The battery in the product itself is not currently required to be certified. This is proving to be a problem as some fires relate to poor quality batteries. Health Canada completed a consultation on battery safety early in 2026 and may develop legislation requiring certification of certain batteries, battery management systems and thirdparty testing. Only the charger sold with the device should be used. The critical issue is that the voltage must match — using the wrong voltage could lead to overheating or fire. The amperage also matters, but somewhat less. Some equipment will auto-

To learn more about recognized Canadian certification marks, visit canada.ca and search lithium-ion battery safety.

“Buying uncertified products means you have entered the wild west.”

matically only draw the amperage needed, but some poorer quality equipment may not, and this too could generate heat and fire risk. Many products with rechargeable batteries don’t come with their own charger. The good news is that if they are USB-C, and you use a certified USB-C charging block, there is a handshake system included that ensures that the voltage received is limited to a safe level. All you need to do is use a quality USB-C cable, so the wire itself doesn’t overheat. Boards can’t force residents to check that the charger that comes with every toy and tool they buy meets these requirements, but they can be part of the solution through resident education. The City of Toronto and Toronto Fire Services have some safety posters available, and Canada has a web-page dedicated to lithium-ion battery safety. SAFE BATTERY DISPOSAL Batteries are causing a significant rise in the number of fires at waste disposal facilities where they can become bent, warped, impacted or otherwise damaged. This potential fire risk underscores the need for safe disposal. Each municipality has different rules for disposing of these batteries. For example, in Toronto, batteries are considered “household hazardous waste” and they cannot be disposed of in the regular garbage. The battery positive terminal should be isolated by putting each battery in a clear plastic bag, or putting clear packing tape, duct tape or electrical tape over the positive terminal. They can then be disposed of at City drop-off depots that accept hazardous waste, at community environment days, at retail drop-offs (found at hardware stores and electronic retailers) or, if someone has more than 10 kg of hazardous waste, they can call the Toxic Taxi to arrange for pickup. Batteries that are damaged or swollen are particularly risky. Ideally, they should be stored in a non-flammable container filled with sand and taken to a disposal centre as soon as possible. LAST WORD And lastly, a warning to all. If you are near a lithium-ion battery that starts to swell or smoke, vacate the space immediately. Do not attempt to put the fire out. Do not attempt to take the battery outside. Get yourself and your family out of the condo as quickly as possible, close the door behind you, and call 911. When batteries explode, it is a split second before you can become engulfed in flames. Sally Thompson, MSc P.Eng, is a founder and managing principal of Synergy Partners and past president of CAI Canada and CCI Toronto. Fall 2026 |

33


FEATURE

EVs in Multistorey Parking Garages What condominium boards can do to manage risk as fire-fighting practices and code requirements play catch up.

By Sally Thompson and Sam Soltani

Electric vehicles (EVs) are much less likely to catch fire than traditional internal combustion engine (ICE) vehicles, however, when the batteries do catch fire, the fire is much more difficult to extinguish. What does this mean for EVs parked in multistorey parking garages? 34

| Fall 2026


FEATURE

I

CE car fires involve the fuel and cabin materials, which are quick to burn, and relatively easy for skilled firefighters to extinguish. Cabin-related fires also occur in EVs and can be dealt with similarly, however, the batteries are a much more significant problem because they store so much energy. A battery fire is hard to reach because the batteries are usually located under the car. In addition, batteries can experience “thermal runaway” which is a self-sustaining chemical reaction that creates intense heat and deadly fumes, including hydrogen fluoride, as adjacent cells of the battery pack ignite. Even worse, once visible flames are gone,

there remains a multi-day (or potentially multiweek) risk of reignition. The U.S National Transportation Safety Board documented one crashed EV that reignited five days after the crash, long after the fire was thought to be over. In a sense, the fire is not extinguished; it is just suppressed/cooled until the car can be moved to a safe place away from combustible materials. The International Association of Fire Chiefs gives guidance on fighting EV fires, noting that full SCBA protection must be worn, that the fire will take significant time to extinguish and that a large volume of water (3,000 to 8,000 gallons, or roughly 11,000 to 30,000 litres) will be needed

because the battery must be cooled down to ambient temperature. Where there is nothing nearby to catch fire, the guidance allows crews to stand back and let the battery burn itself out. That might work on a highway shoulder or even a driveway away from the house, but it is not an option in a parking garage, where everything within reach is an exposure: the next car, the column or slab of the garage and the residents living above. In a garage, firefighters will need to continuously apply water, often for many hours, until the battery is cool enough to safely tow the car out of the garage. During a car fire, the sprinkler system installed in a parking garage is intended to reduce the risk

1-866-570-2757

Fall 2026 |

35


FEATURE

of fire from spreading to adjacent vehicles, and to protect the structure from overheating. The water flow from the overhead sprinklers will not put out an EV-battery fire. The firefighters must do this using their hoses. With internal combustion engines, the one- or two-hour fire resistance rating on the adjacent columns and slabs (depending on building height) should give the firefighters enough time to deal with the fire. It is often said that EV fires burn hotter. However, tests done so far, including burns run by the National Research Council of Canada for Transport Canada, do not show that. Peak heat output from an EV was similar to or lower than the gasoline twin, because a full tank of gasoline is itself a very large fire. What is different is the shape of the fire. A battery undergoing thermal runaway can throw a horizontal jet of flames in the next parking space. It also keeps going long after a gasoline fire would have peaked, and it can reignite as noted previously. The risk is mostly about how long the fire lasts rather than the higher temperature. It is not immediately obvious that the fire ratings for the building structural elements required by current

code will be sufficient to withstand an EV fire, particularly if more than one car is involved. Automated parking systems, which are also becoming more common, place cars closer together, and restrict access for sprinklers and firefighters, amplifying the risks. Here in Canada, the sprinkler coverage and ventilation in parking garages have not changed since EVs have come onto the scene. The National Fire Protection Association (NFPA), whose standards are referenced in our building code, reclassified parking garages to a higher hazard group in the 2022 edition of NFPA 13, the standard which governs sprinkler systems. This raises the required water density by about a third. Two things are worth knowing about the change: it was driven by research on modern cars generally, mostly the doubling of plastics in cars since the 1970s, rather than EVs. And even the 2025 edition of NFPA 13 says nothing specific about EVs or charging stations. Either way, it will be some time until these new standards hit our building codes. For now, the Ontario Building Code still references the 2019 edition of the NFPA 13 standard. Ventilation re-

quirements in the code are intended to deal with exhaust fumes from ICE exhausts; they are not currently designed to vent hazardous, and potentially hot fumes related to a fire. The lag between the massive introduction of EVs and appropriate changes to codes and standards means that existing buildings, including brand new buildings, may prove to have insufficient systems in place to prevent fire spread or damage to the structure from EV fires. According to the Zero Emission Vehicle Alliance (ZEV Alliance), governments across the globe have started implementing different safety practices. For example, in Austria, since 2023, EVcharging stations must be installed near garage entrances so that firefighters can easily remove the EV, must be protected from vehicle impact, and must be equipped with remote shutdown devices to cut power to the chargers. In the Netherlands, national guidance recommends collision protection around chargers and a single switch that cuts power to all of them at once. In the UK, the United States and Canada, research is underway to identify risks and best practices. Most current guidance

DUCT CLEANING

• HVAC MAINTENANCE • Celebrating Over 20 years Servicing the Condo Industry

OFFERING QUALITY SERVICES SUCH AS: • Dryer Vent Exhaust Cleaning Programs with Nadca Certified Staff • Heat Pump Maintenance & Repair Programs • Fan Coil Maintenance & Repair Programs • Building Wide Duct Cleaning Service • Exhaust Cleaning Services • Makeup Shaft Cleaning Services 225 Traders Blvd. East. Unit 9, Mississauga, ON L4Z 3L8 East: 416-651-3828 | West: 905-279-3828 | Toll free: 1-877-891-3828 info@superioradc.com | www.superioradc.com 36

| Fall 2026


FEATURE

and testing related to fighting EV fires currently focuses on EVs on the streets, not in underground parking garages. In other words, our building fire safety standards are playing catch up, and we are currently making it up as we go along. A rental or commercial landlord can simply put EV parking outside or near the entrance at ground level. A condominium typically cannot, because chargers get installed in whichever owner’s particular parking spot. WHAT CAN A CONDO BOARD DO RIGHT NOW TO MANAGE RISK? Do not let anyone interfere with the sprinklers. Make sure the garage system is being inspected and tested on the schedule the Ontario Fire Code requires, and that no heads have been painted over or blocked by stored materials. Concierge or security staff should have written instructions that nobody silences the alarm or isolates the sprinkler system until the fire department says so, no matter how many false alarms the building has had. When an owner applies to install a charger, the Condo Act gives the corporation 60 days to accept or propose an alternative installation as long as it’s reasonable. If your documents give you any flexibility, you should take advantage of it to cluster chargers where a fire crew can reach them: the top underground floor, close to the exit door or exhaust shaft, away from exit stairs, elevator lobbies or intake grilles for fresh air, and away from main electrical rooms. Give the fire department one switch. A single, clearly marked labelled disconnect that cuts power to every EV charger should be provided, somewhere near the garage entrance or security desk. Otherwise, the chargers can keep feeding power to a car that is already on fire. Update the fire safety plan and invite fire departments in. Fire safety plan should show the location of the EV spaces and chargers. Many fire departments will do a walkthrough if asked so they can become familiar with your building. And lastly, ensure all installations are properly designed, meet code requirements, are completed by licensed electricians and that the Electrical Safety Authority has reviewed the final installation. As the EV car stock gets larger and the cars age, we can reasonably expect that EV battery fires will become more commonplace. Codes will probably change to require additional sprinkler coverage, perhaps higher fire resistance ratings for structural elements, and possibly other features or location restrictions. Building code changes will only affect new buildings. Retrofit-

ting of existing buildings will be governed by changes to the fire code, if any. Fire-fighting practices will also evolve, hopefully making it easier to fight EV battery fires. Our industry should watch closely as fire-fighting practices and fire code requirements catch up with the risk. And in the meantime, boards can take some of the recommended steps above.

Sally Thompson M.Sc. P.Eng., is the Managing Principal of Synergy Partners Consulting and Past-President of CAI Canada and CCI Toronto. Sam Soltani P.Eng., LEED AP, is the President of Trace Consulting Group and is a Director of CAI Canada.

• Learning • Growth

• Sharing

• Community • Support

ACMO

MENTORSHIP Program Designed for professionals at every stage of their careers, the mentorship program creates meaningful opportunities to learn, share expertise, and build connections across roles and organizations. Whether you’re looking to gain practical insights and guidance from experienced industry leaders, or you’re ready to share your knowledge and help shape the next generation of professionals, there’s a place for you in the program. If you’re ready to take the next step—by learning, leading, or both—we want to hear from you!

Join as a Mentor or Mentee Visit acmo.org today! Fall 2026 |

37


ENERGY & SUSTAINABILITY

Using Utility Data to Improve Condo Performance Ontario’s larger condominium and rental apartment buildings already collect valuable energy and water information. The opportunity is to refine it, understand it and use it. By Scott Rouse

38

| Fall 2026


ENERGY & SUSTAINABILITY

O

ntario’s larger multi-residential buildings have an energy-management advantage hiding in plain sight: much of the information needed to establish a performance baseline is already being collected. Under Ontario’s Energy and Water Reporting and Benchmarking (EWRB) requirement, covered buildings of 50,000 square feet or more report whole-building energy and water use through ENERGY STAR Portfolio Manager. This includes both condominium and rental apartment buildings. For many properties, several years of electricity, natural gas and water information are already stored in one place. Reporting, however, is not the same as managing. Provincial and municipal reporting systems are designed first to meet regulatory requirements. The information returned to owners and managers may be presented as broad annual totals or in units such as gigajoules, British thermal units and U.S. gallons. A submission can therefore be complete without clearly answering the practical questions a board, owner or operator needs to ask: Is the building improving or declining? Which utility is driving a cost increase? Did performance change after an operating adjustment? How does the property compare with similar buildings? Answering those questions requires the reported data to be validated, translated into familiar measures and reviewed as a trend rather than a once-a-year snapshot. Data quality also matters. A missing metre, incorrect gross floor area, estimated bill or inconsistent property boundary can materially change the result. The good news is that once the information is refined and understood, it becomes a

useful management asset rather than simply a compliance record. Although condominium corporations and rental owners have different governance and approval structures, the operating opportunity is similar. Both manage central heating, cooling, ventilation, domestic hot-water, pumping, lighting and control systems. Both must balance energy costs with comfort, safety, reliability and long-term asset performance. This opportunity can be organized into six practical steps. SIX STEPS: FROM REPORTED DATA TO RESULTS Establish a validated baseline Confirm that monthly electricity, natural gas, water, cost and greenhouse gas information is complete and comparable. Check the property boundary, gross floor area, suite count, meters, missing bills and estimated readings. Mandatory reporting provides a valuable starting point, but the baseline must be trusted before it can guide a decision.

1

2

Translate and understand the data Convert the information into measures that boards, owners and operating teams can readily use: electricity in kWh per square foot, natural gas and water in cubic metres per square foot, total energy in equivalent kWh per square foot and, where useful, consumption per suite. Monthly and year-over-year trends make changes visible; weather normalization can provide additional context.

3

Set priorities and make performance visible Compare performance with prior years, budgets and relevant peer buildings. Use

a concise scorecard to show energy, water, cost and emissions without overwhelming decision-makers with data. Focus on material changes, establish a target and identify a manageable number of priorities that warrant investigation.

4

Assign clear responsibility Energy performance crosses governance and operations. A condominium board or rental owner approves priorities, budgets and targets; property management coordinates the work; operations staff investigate, implement and maintain changes; and specialists provide analysis, commissioning or measurement and verification where needed. Clear ownership prevents findings from disappearing between reports or meetings.

5

Investigate and implement Test how heating, cooling, ventilation, domestic hot water, pumps, fans and controls actually operate against current building requirements. Existing Building Commissioning (EBCx) can uncover scheduling conflicts, simultaneous heating and cooling, control-sequence problems, excessive run times and other operational issues. Measures can then be ranked by cost, impact, disruption and effect on resident comfort.

6

Verify and sustain Confirm that completed changes produced the expected result, continue watching for anomalies and correct performance drift. Updated control sequences, operator training and regular review turn a one-time improvement into an operating practice. Without verification Fall 2026 |

39


ENERGY & SUSTAINABILITY

and persistence, savings can erode quietly. COMMISSIONING CONNECTS COST AND COMFORT The relationship between efficiency and comfort is particularly important in residential buildings. A poorly considered op-

erating change may reduce electricity use while creating temperature or ventilation complaints. Proper EBCx uses trend data, functional testing and operator knowledge to determine how systems are performing and whether changes can improve efficiency

without compromising resident needs. The not-for-profit Independent Electricity System Operator’s (IESO) Save on Energy EBCx program reflects this operating cycle through investigation, implementation and persistence phases. It offers incentives for qualified commissioning work and confirmed savings, subject to eligibility requirements and caps. Eligible facilities must meet program criteria that include at least 12 consecutive months of energy data and annual electricity consumption of at least 750,000 kWh. As of September 2026, current terms provide an investigation incentive of up to $0.06 per square foot, capped at $50,000 per application or 75 per cent of eligible commissioning-provider costs. Implementation and persistence incentives are each calculated at $0.03 per kWh of confirmed savings, with stated caps. Owners should confirm the current requirements

INFORM | EDUCATE | CONNECT CHECK OUT OUR UPCOMING EVENTS

NOV 18

Charged with Caution: Lithium-Ion Battery Safety in Condominiums

NOV 21

Directors Certificate Courses

DEC 02

Season’s Briefings: Holiday Lunch & Legal Panel

CCI-EO Members get preferred registration rates!

cci-easternontario.ca 40

| Fall 2026


ENERGY & SUSTAINABILITY

before developing an application. CONDOMINIUM AND RENTAL EXAMPLES A condominium example shows what can happen when reported information becomes management information. A City of Toronto case study at Kilgour Estate reported a 26 per cent reduction in annual utility costs after the building team collected, reviewed, understood and acted on its data. The lesson was not the performance of one technology; improvement began when the team used the information to identify and address operating opportunities. A rental example demonstrates the value of investigation, even in a relatively new building. At 15 Roehampton Avenue in Toronto, a 36-storey property with 466 suites that opened in 2018, an EBCx review of the heating, cooling, ventilation and

building-automation systems produced 23 operational findings. Six measures with quantified electricity impacts represented approximately 300,000 kWh in projected annual savings. The presentation estimated a combined value of $62,000 from avoided electricity costs and incentives against an estimated $30,000 cost. Those figures are projected opportunities and require verification after implementation. That distinction is essential. A credible energy-management process separates observed performance, estimated potential and confirmed savings, and reports each one clearly. A MORE USEFUL REQUEST FROM LEADERSHIP The immediate opportunity for many Ontario multi-residential buildings is not another stack of data. It is a clearer request for what the information should

produce. At minimum, a condominium board or rental owner should be able to ask for four outputs: a validated baseline, a plain-language performance scorecard, three clearly ranked priorities and a monitoring plan with an accountable owner for each action. Ontario’s reporting framework has made a valuable data asset available. Its value is realized only when the information is refined, understood and acted upon. Buildings that treat annual reporting as the beginning of energy management, rather than the end of compliance, will be better positioned to control operating costs, maintain resident comfort and sustain improvement. Scott Rouse, P.Eng., MBA, CEM, CMVP, PMVA, is the Managing Partner at Energy@ Work. Scott recently presented the six-step approach during a Save on Energy multiresidential webinar.

Don’t let your mechanical room control your capital plan. Aging boilers, HVAC, and water heating systems need more maintenance, repairs, and may need replacing. Enercare Advantage® lets you upgrade your equipment for $0 upfront* while providing ongoing service and maintenance.

$0 Upfront Repairs & maintenance Same-day service**

Plan your next equipment upgrade.

enercare.ca/commercial 800-321-1508

*Terms and conditions and certain exceptions apply. See rental agreement for details. **Available to Enercare’s Heating/Cooling protection plan customers, rental water heater customers and/or rental HVAC customers whose equipment is not operational (for example – no heat, no cooling or no hot water). On average, Enercare attends to furnace/boiler, central air conditioner, or water heater non-operational calls 80% of the time the same day. Subject to exclusions in accordance with the terms and conditions of the applicable protection plan or rental agreement. ®Enercare, Enercare Advantage and the design are trademarks of Enercare Inc., used under license.

ECH3989_EnercareAdvantageAd_7_125x4_75_Apt_d2.indd 1

2026-08-28 11:18 AM Fall 2026 | 41


WHAT GETS MEASURED, GETS MANAGED Why Data Matters More Than Ever in Condominium Management

SPONSORED CONTENT

By Katherine Gow, Executive Director, ACMO

P

eter Drucker famously observed that “what gets measured, gets managed.” While the phrase has become a staple of business strategy, it has never been more relevant to condominium management than it is today. Condominium corporations are increasingly expected to operate like sophisticated businesses. Boards, owners, regulators, and service providers all want greater transparency, stronger financial stewardship, and better long-term planning. Meeting these expectations requires more than experience and intuition. It requires data. For condominium managers, measurement is no longer simply about tracking expenses against budget. Today’s most effective managers understand that operational data can reveal emerging risks, uncover opportunities for savings, improve sustainability outcomes, and support more informed decision-making.

The Hidden Story Behind Utility Bills Few areas illustrate the value of measurement better than utility consumption. Many boards carefully review monthly utility invoices, focusing primarily on whether costs are increasing or decreasing. However, utility spending alone only tells part of the story; consumption data often provides far more meaningful insights. A spike in water usage may indicate an undetected leak. An increase in electricity consumption could signal aging equipment operating inefficiently. Seasonal patterns may highlight opportunities to optimize building systems and reduce costs without compromising resident comfort. Managers who understand consumption histories can identify trends before they become problems. Rather than simply reacting to higher invoices, they can investigate the underlying causes and


SPONSORED CONTENT

work with boards to implement proactive solutions. Over time, these small interventions can significantly reduce operating expenses while extending the lifespan of building assets.

Benchmarking Creates Context Data becomes even more powerful when it can be compared against meaningful benchmarks. This is one of the reasons Energy and Water Reporting and Benchmarking (ERWB) requirements have become increasingly important in Ontario’s condominium sector. Benchmarking allows buildings to compare their performance against similar properties, helping boards and managers understand whether their utility consumption reflects normal operating conditions or signals opportunities for improvement. Without benchmarking, a building’s energy consumption number is simply a number. With benchmarking, that same figure becomes actionable information. Managers can identify whether a property is performing above or below comparable buildings, assess the effectiveness of capital investments, and support evidence-based recommendations to boards. Benchmarking also helps establish realistic performance targets and demonstrates progress toward sustainability goals over time. As utility costs continue to rise and environmental performance becomes a growing priority for owners and residents alike, understanding ERWB data is quickly becoming an essential competency for condominium professionals.

Building Data Literacy Through Mentorship For professionals entering the condominium management industry, understanding utility analytics and benchmarking can feel overwhelming. There is a significant difference between reviewing a utility invoice and truly understanding the operational story behind the numbers. This is where mentorship plays an increasingly important role. ACMO’s mentorship program connects emerging professionals with experienced leaders who have developed practical expertise across all aspects of condominium management. Through these relationships, mentees gain valuable exposure to concepts that may not be fully explored in formal educational programs,

including the interpretation of utility consumption trends, sustainability planning, reserve fund implications, and performance benchmarking. Experienced mentors help bridge the gap between theory and practice. They can explain why a water consumption trend matters, how to identify anomalies in reporting data, and how to present complex operational information in a way that boards can understand and act upon. Perhaps most importantly, mentors help emerging managers recognize that effective condominium management is increasingly driven by analysis rather than assumption.

Moving from Reactive to Strategic The condominium management profession continues to evolve. Today’s managers are expected to provide strategic guidance, support governance excellence, navigate regulatory requirements, and contribute to the long-term success of the communities they serve. Achieving these objectives requires access to reliable information and the ability to interpret it effectively. When managers regularly monitor utility consumption histories, review benchmark data, analyze maintenance trends, and track operational performance indicators, they put themselves and their boards in a stronger position to make informed decisions. Data alone does not solve problems; people do.. But data helps people identify the right problems to solve. As condominium corporations face increasing financial pressures, aging infrastructure, and growing expectations around sustainability, the managers who thrive will be those who embrace measurement as a management tool rather than an administrative requirement. In condominium management, as in business, what gets measured truly does get managed. And what gets managed well, ultimately delivers value to the communities we serve.


TECHNOLOGY

Emerging Tech Redefines Aging In Place Smart home devices are evolving into wellness-focused support systems that promote independence and comfort.

By Rebecca Melnyk

44

| Fall 2026

N

ew technologies are powering homes into active support systems that can monitor, predict and respond to the changing needs of older adults and boost their quality of life. However, challenges with affordability, ease of use, and interoperability remain prime barriers to widespread adoption within all types of housing. This was a key theme during a recent webinar hosted by the Association for Smarter Homes and Buildings (ASHB), the National Aging in Place Council and Customized Aging. Aging in place has historically focused on preparing for emergen-

cies such as fall detection, grab bars, emergency response buttons, and wheelchair accessibility, noted ASHB CEO Greg Walker. An evolving approach leverages smart technology to support wellness, sleep, indoor air quality, medication adherence, and independence. Canadians aged 65 and older will make up nearly a quarter of the population by 2030 and the majority plan on remaining in their homes for as long as possible. Innovative tools like artificial intelligence (AI), sensors, voice technology and connected-home platforms can help this demographic live safely and comfortably, particularly


TECHNOLOGY

“Instead of aging in place, I really look at it as living well at home because that is the goal.” amid a healthcare workforce shortage and impending caregiver crisis. According to the Canadian Centre for Caregiving Excellence, “a perfect storm is brewing” when it comes to senior care. Demand is growing, caregivers are aging, the number of available caregivers is dwindling, and care needs are becoming more complex due to the aging population, higher rates of disability and mental health problems. Smart technology can perhaps ease some of these challenges. AGING-IN-PLACE TECHNOLOGY EVOLVES Elizabeth Parks, president and CMO of Parks Associates, a smart home technology research organization based in the U.S., sees growing demand among family caregivers for technology that supports their loved ones. She predicts smart TVs will become an important tool for older adults to communicate with their doctors or care providers. “That’s going to be a really big deal for seniors because they’re very much used to the television. It’s a big screen, there are easy ways to interact as long as the software platforms are built well, and there’s a lot of integration that can go through the television operating system,” she said. Personal emergency response system (PERS) devices, traditionally used as fall alert systems, are often stigmatized and rejected due to their association with growing older. Parks also sees promise in more innovative voice-connected wearables and hardware, which will improve accessible communication in the future. The challenge lies in developing products that are both affordable for consumers and financially viable for providers. Jeffrey Gray, founder and CEO of AgeTech Connect, a U.S.-based hub for innovators, entrepreneurs, and organizations focused on the growing longevity economy, said the key to developing ef-

fective aging-in-place technology is understanding what seniors and their caregivers primarily need beyond the “nice-to-have products.” “The biggest and most successful advancement in aging-in-place technology will be happening as soon as we have robots in the house that can help with real tasks and we’re super close on that,” he said. “Prices will come down, and I think there are a lot of people who would buy a $10,000 robot, a $15,000 robot, and finance it in exchange for the kind of help that device could render. I don’t see that price point being an obstacle because I think the device itself will be so desirable.” Through his work, Gray has identified three main pain points among seniors and caregivers that new solutions should target: not having enough money, a lack of time, and difficulty navigating health-care systems. Addressing these challenges will help close the gap between innovation and real-world implementation. Robert Lane, president and managing partner of Toronto-based Robert H. Lane & Associates, cautioned that smart-home products should also be designed with older users in mind. Small buttons, tiny text and complicated interfaces often undermine useful technology. ‘LIVING WELL AT HOME,’ A NEW PERSPECTIVE Adoption is expected to accelerate once tools are more adaptable and easy to use. “Instead of aging in place, I really look at it as living well at home because that is the goal,” said Cambria Jacobs, founder of Collaboration in Aging.” Jacobs believes that homes should be optimized for wellness before crises, with improved lighting, acoustics, temperature control, flexibility, and indoor air quality, alongside emergency-response tools and sensors.

IDENTIFYING PATTERNS BEFORE EMERGENCIES Research from Parks Associates underscores that today’s consumers rarely rely on one single smart solution, but are increasingly combining multiple devices, such as smart locks, video doorbells, activity sensors, fall detection, thermostats, and voice-enabled devices. By integrating these technologies, data can provide a more complete picture of what is happening in a home. Taking that a step further, AI could identify patterns and flag changes before they morph into emergencies. “The key thing to remember is that you aren’t really selling AI; you’re selling solutions to these everyday problems that the caregiver or seniors are having,” said Parks. “Just remembering to take medicine is a great example of something that’s a daily challenge and where technology could play a huge role.” According to AgeTech, sensor technology in the home typically meant a single pendant button or a motion detector wired to a call centre. But a new generation of ambient sensing platforms is incorporating passive monitoring capabilities throughout the living environment, “turning ordinary homes into continuous health observation systems that operate without requiring any action from the older adult.” These platforms detect gradual pattern changes — a slower gait, disrupted sleep cycles, reduced time in the kitchen — that link to earlystage cognitive decline, medication non-adherence, and deteriorating chronic conditions. This is shifting the technology’s value from reactive safety to proactive care intelligence. Further research from Parks Associates found a higher frequency of remote interactions through phone calls, apps, and different connected technologies. “There is this level of confidence that families want to have and that care providers want to have about that physical check-in without actually having to physically be there,” said Parks. “This is really unlocking incredible opportunities for remote monitoring platforms, proactive notifications, AI-generated insights and all of the different data that comes along with sensor-based technologies.” Fall 2026 |

45


MANAGEMENT

Strata Management in B.C.: Two Perspectives

By Ryan Stenquist and Wendy Hall

Operating a strata corporation has become a complex venture for both managers and volunteer councils in British Columbia. The number of corporations is growing as the pool of strata managers shrinks. Ryan Stenquist, strata consultant and founder of Condo Clear, and Wendy Wall, president of the Vancouver Island Strata Owners Association, discuss their perspectives on the state of the industry and where it goes from here. ATTRACTING AND RETAINING NEW LICENSEES Stenquist: The industry is failing to attract and retain the qualified people it needs, largely due to a lack of proper education and training mechanisms and a resistance to evolving outdated business practices. But this isn’t solely a management problem: increased responsibilities that legislation imposes, along with 46

| Fall 2026

rising and often unrealistic expectations from strata owners and council members, are placing pressure on the people the industry is trying to retain. Wall: Yes, the number of people entering the strata management profession is not keeping pace with the number that are retiring. The churn is particularly concerning. The licensing course


MANAGEMENT

doesn’t adequately prepare new licensees for the role so they need support and mentoring when they are hired by a brokerage. It’s a demanding and emotionally-draining job. Without ongoing, meaningful support, they struggle, burn out, and quickly exit strata management to more attractive roles such as rental management or realtor services. CONSUMER EXPECTATIONS Stenquist: Consumer expectations are higher than ever, driven largely by the adoption of technology, which has all but eliminated any hurdle to communication. Strata managers are now so overwhelmed by an abundance of relatively minor or petty concerns (and the interpersonal dynamics that come with them) that the role has transformed from managing a physical asset into managing the people and personalities who reside within it. In reality, most managers now spend more time dealing with councils and owners than with the strata corporation as a whole. Wall: Councils are legally responsible for the management and operations of the strata corporation whereas strata management is a contracted service. It doesn’t cover every task. Council members are advised to read the contract, set reasonable expectations, and be clear about who is performing which task. The strata will run more smoothly and get more accomplished by fostering a cooperative working relationship with their manager, if possible. CLIENT PROFILES Stenquist: From a business standpoint, it’s challenging to price a strata corporation accurately as they are not created equal and the workload is driven largely by the personalities involved rather than the building itself. A manager might oversee a 200-unit strata where everything runs smoothly and the council is reasonable, which makes it economically viable. On the other hand, they could have a 40unit building that takes up two to three times the effort and operates at a loss.

Wall: Even a duplex strata can take up a disproportionate amount of time for a manager. Small stratas often need the help of professional management due to conflict and a history of non-compliance with the Strata Property Act. Some strata corporations are so time-consuming or litigious that it’s understandable when the brokerage terminates the arrangement. They’re not making any money and they often have a wait list of other strata corporations seeking management services. FEES FOR STRATA MANAGEMENT SERVICES Stenquist: Management companies aren’t doing themselves any favours either. Strata management fees have barely changed in twenty years, which has pushed individual managers to take on even more buildings to earn a decent wage. The result is a volume-based business model where a service-based one is needed. What’s

puzzling is that this persists despite high demand: it’s a sellers’ market, yet management companies still seem to compete on price rather than value. Wall: Strata owners tend to look at the annual cost of each budget item without doing the math. A manager with a portfolio of 12 strata clients has about three hours per week to provide service to each client. Their time is best spent arranging maintenance, reviewing invoices, writing letters and notices, not being flooded with emails and phone calls. If strata corporations are only willing to pay a certain amount for a service, they have to set their expectations accordingly. Tailored service packages are a great way to balance cost and the level of service. A strata with a well-functioning council can do very well with a contract for financial services and help with annual general meetings. It keeps

CONDOLAW.TO 2300 Yonge Street, Suite 1901 Box 2384 Toronto Ontario Canada M4P 1E4

T F w

416 489 5677 416 489 7794 condolaw.to

With over 45 years of experience in condominium law, DSFM is legal counsel to over 500 condominium corporations, as well as condominium purchasers and homeowner groups, across Ontario.

Fall 2026 |

47


MANAGEMENT

costs manageable while still providing professional support. HOW CAN FIRMS CREATE A VIABLE BUSINESS MODEL? Stenquist: There is a chicken-or-egg problem. Owners won’t pay more for service when their past experience has been sub-par, yet companies can’t meaningfully raise service levels — and stay viable — without charging more. Each side is waiting for the other to move first. Wall: The number of hours of work stratas can expect for the amount paid needs to be objective, but they are also paying for professional services. Too often, managers provide incorrect information to strata councils about privacy, access to records, voting, proxies, bylaw enforcement, and spending. Whether it’s lack of training or experience it’s unacceptable. Council members are volunteers. Managers are paid professionals: their mistakes can lead a

48

| Fall 2026

strata corporation into conflict, stress, and even legal action. That’s not fair or just. Education for strata managers has to improve. CLOSING THOUGHTS Stenquist: From a regulatory perspective, I have one word: accountability. Right now there’s a lot of finger pointing, when the reality is that the root of the issue doesn’t land solely on one party. There needs to be a real mechanism to hold both councils and managers answerable for their actions. On the business side, management companies need to abandon an outdated and failing model in favour of one that uses technology to deliver genuine service at a sustainable cost. Wall: The industry is in crisis. There is an urgent need for better education and support for strata managers. British Columbians also need the regulator to hold strata managers and brokerages to account if they violate the Real Estate Services Rules

or are not acting in the best interests of their client. The regulator has the ability to apply administrative penalties in many situations including misconduct and a failure to act with reasonable care and skills. Ryan Stenquist is the founder of Condo Clear Services, which specializes in strata document review and summarization for buyers and realtors, strata corporation consulting, and realtor education. He has been involved in every aspect of strata living and business over the last 20 years including being an owner, council member/ president, strata manager and owning a real estate brokerage. Wendy Wall is the president of the Vancouver Island Strata Owners Association, a non-profit society that provides education and support to strata owners and councils across BC. Now in its 53rd year, VISOA is the longest-running society of its kind in Canada. Visit visoa.bc.ca


MANAGEMENT CORNER

The Digital Governance Gap Why condo boards must modernize their practices: a property management perspective.

C By Shane Haskell

50

| Fall 2026

ondominium corporations across Ontario are facing a new kind of governance challenge, one that isn’t caused by rising insurance premiums, aging infrastructure, or market volatility. It’s the widening digital governance gap and it’s quietly becoming one of the biggest operational risks for condo communities in 2026. Boards are asked to make faster decisions, manage more complex issues, and meet higher regulatory expectations, yet many are still relying on governance practices built for a different era. The result is inefficiency, miscommunication, and increased exposure to compliance and liability risks.

THE GROWING DIVIDE The digital governance gap is the growing divide between what modern condo governance requires and the outdated tools and processes many boards still use. Most corporations still rely on: • Email chains as their primary communication method; • Paper-based records, payment processing and filing systems; • Manual tracking of purchase orders, incidents, and approvals; • Ad-hoc decision-making without centralized documentation; and • Outdated meeting practices that lack transparency and structure.


MANAGEMENT CORNER

fusion, conflict, complaints, and delays in decision-making.

2

Compliance Exposure Boards must maintain accurate records, accessible documents, and transparent decision-making. Without digital systems records become fragmented, meeting minutes lack detail, approvals aren’t properly tracked, and corporations risk non-compliance with CAO/ CMRAO expectations.

3

Inefficient Operations Manual processes slow everything down. Purchase orders take longer with no formal procurement process. Vendor coordination becomes messy. Incident tracking is inconsistent. Managers spend more time chasing information instead of managing, and payment processing is antiquated.

4 Meanwhile, the expectations placed on board of directors have increased dramatically. Here are a few: • The Condominium Authority of Ontario (CAO) and Condominium Management Regulatory Authority of Ontario (CMRAO) emphasize digital recordkeeping, transparency, and accessibility; • Owners expect timely communication and professional workflows • Buildings require more complex maintenance planning and vendor oversight; and • Risk management now demands audit trails, documentation, and accountability.

Boards are being asked to operate like professional governance bodies, but many are still equipped like volunteer committees. HOW THE GAP CREATES REAL OPERATIONAL RISK From a manager’s perspective, the digital governance gap isn’t just inconvenient; it’s dangerous. It creates vulnerabilities that affect the corporation’s finances, compliance, and community stability. Communication Breakdowns Email chains get lost, misinterpreted, or buried. Decisions made informally aren’t documented. Owners receive inconsistent messaging. This leads to: con-

1

Higher Liability Without digital audit trails, corporations struggle to defend decisions, enforce rules, or demonstrate due diligence. This increases exposure in legal disputes, insurance claims, owner complaints, enforcement actions, and financial auditing. WHY BOARDS STRUGGLE TO MODERNIZE Boards aren’t resistant; they’re overwhelmed. Most directors are volunteers with full-time jobs, limited time, and varying levels of digital comfort. Some common barriers include the fear of adopting new systems, a lack of training, misunderstanding the manager’s role, a belief that “email is good enough,” and a concern about cost, even when solutions are inexpensive. However the cost of not modernizing is far higher. Fall 2026 |

51


MANAGEMENT CORNER

“Managers are uniquely positioned to help boards modernize.”

WHAT MODERN DIGITAL GOVERNANCE LOOKS LIKE From a manager’s perspective, digital governance is about clarity, structure, and accountability, not fancy software. A modern board uses centralized communication platforms, digital record management with searchable archives, automated workflows for approvals, notices, procurement and purchase orders, dashboards for financials, maintenance, and compliance, secure portals for own-

52

| Fall 2026

ers and directors, templates for consistent communication, and digital meeting packages with linked documents and action logs. This is the new baseline for professional governance. THE MANAGER’S ROLE IN CLOSING THE GAP Managers are uniquely positioned to help boards modernize. They see the operational bottlenecks, the communication fail-

ures, and the compliance risks firsthand. Here’s how managers can lead the transition: Introduce Structured Communication Systems Move boards away from email chains and into centralized platforms that track discussions, decisions, and documents.

1

2

Implement Digital Workflows Automate repetitive tasks such as procurement and purchase order tracking, incident reporting, vendor approvals, notice distribution, and electronic payment approvals and processing.

3

Create Digital Governance Frameworks Provide boards with communication policies, digital meeting templates, docu-


MANAGEMENT CORNER

ment retention schedules, and decisionmaking protocols

4

Educate and Support Directors Offer training, onboarding, and ongoing support to help directors feel confident using new tools.

5

Build Transparency and Accountability Use dashboards, logs, tags and audit trails to ensure every decision is documented and defensible. WHY BOARDS MUST ACT NOW The digital governance gap is widening and corporations that fail to modernize will face higher operational costs, increased conflict, greater compliance risk, lower owner satisfaction, and difficulty attracting qualified managers.

On the other hand, boards that embrace digital governance will make better decisions, operate more efficiently, strengthen community trust, reduce liability and support their managers more effectively. Modern governance isn’t optional anymore. Condo corporations are growing more complex, more regulated, and more demanding. Boards cannot meet today’s expectations with yesterday’s tools. Closing the digital governance gap isn’t just a technological upgrade — it’s a governance evolution, and managers are ready to lead it. Shane Haskell is the owner/founder of Lionheart Property Management Inc., where he is responsible for the day-to-day operations. Lionheart is an ACMO2000 organization.

Shane has several years’ experience in the financial industry, marketing, project management, real estate and property management industry. He is a principal condominium manager (PCM) and general licensed manager (OLCM) with CMRAO, a registered condominium manager (RCM) with ACMO, and a leader of The Condominium Institute (LCCI). He is a member of CMRAO’s discipline hearing committee and also sits on the board of directors and chairs the marketing committee of the Canadian Condominium Institute Toronto Chapter. He previously sat on CCI’s national executive board and is current chair of the CCI national advertising, resources and communication committee. He is also the president and Realtor® of Lionheart Realty Brokerage.

ALUMINUM & VINYL

WINDOWS & DOORS Specialized in window and door replacement for: Apartment Buildings • Condominium Townhomes • Government Institutions Exceptional customer service and competitive pricing. info@crystalwindowsanddoors.ca

647-400-3815 Fall 2026 |

53


FINANCIAL MANAGEMENT

What Condo Boards Should Do Before Audit Season Good preparation starts long before the auditor asks for the first document.

By Harjoet Mudan

For many condo boards, the annual audit can feel like a year-end exercise: the fiscal year closes, the auditor sends a request list, and the board and property manager begin gathering what is needed. But the smoothest audits are often due to financial practices that have been maintained throughout the year. 54

| Fall 2026


FINANCIAL MANAGEMENT

A

n efficient audit is not simply easier for the property manager or accountant. It can reduce unnecessary delays and additional work, give directors greater confidence in the corporation’s financial information, and identify issues before they become more difficult to address. START WITH COMPLETE AND CONSISTENT RECORDS The foundation of audit readiness is a complete and accurate general ledger supported by the underlying documentation. Problems often emerge when records have accumulated inconsistencies throughout the year. An account may not have been reconciled regularly. An invoice may be missing. An expense may have been recorded in the wrong period. There may be different versions of a schedule circulating between management, the board, and the accountant. By the time the auditor receives the records, those seemingly small issues can create a much larger reconciliation exercise. A formal month-end process can prevent much of this. Bank and investment accounts should be reconciled regularly. Accounts payable and receivable should be reviewed. Accruals and other journal entries should be consistently recorded. Supporting documents should be retained in an organized way and easy to connect back to the transactions recorded in the books. The objective is not simply to make the auditor’s job easier. Reliable monthly financial information gives the board a clearer picture of the corporation throughout the year. HAVE THE SUPPORTING SCHEDULES READY Auditors do not look only at the final financial statements. They need evidence supporting the balances and transactions behind them. For a condo corporation, that can include bank and investment records, accounts receivable and payable information, invoices, contracts, reserve fund activity, information related to capital projects, and documentation supporting significant or unusual transactions. Board minutes can also be important when they document financial decisions or approvals that affect the corporation’s accounts. Organization makes a significant difference. When supporting information can be produced quickly and tied back to the financial records, the audit can move forward. When schedules are incomplete or figures do not reconcile, the process can stall while management investigates.

One of the most effective things a corporation can do is review the auditor’s request list from the previous year well before the next audit begins. Most of the recurring information can be maintained throughout the year. DON’T WAIT FOR THE AUDIT TO FIX THE BOOKS A common misconception is that inconsistencies can be cleaned up once the audit is underway. In practice, that often creates more work. Auditors plan their procedures based on the information they receive at the beginning of the engagement. If those records substantially change later on, or new issues appear as the work progresses, parts of the audit may need to be reassessed. Additional documentation may be requested, samples may need to be expanded, work might have to be repeated, and areas initially considered lower risk may require more attention. This is why unreconciled accounts, missing invoices, incomplete schedules, incorrectly classified transactions, or unexplained balances can have such a disproportionate effect on the timing of an audit. The goal should be to give the auditor a stable set of records at the outset, rather than treating the audit as the process through which the records will become final. BOARDS NEED ONGOING VISIBILITY Property managers and accounting professionals may handle much of the day-to-day financial administration, but the board still has an important oversight role. Directors do not need to perform the bookkeeping themselves. They should, however, understand enough about the corporation’s financial reporting to recognize when something needs attention. Throughout the year, boards should be asking practical questions. Are bank accounts reconciled every month? Are outstanding receivables increasing? Are there significant differences between actual operating results and the approved budget? Are unusual expenses clearly explained? Is reserve fund spending being tracked appropriately? Are known obligations being recorded in the proper period? A board should also understand who prepares financial information and who reviews it. Even with a lean management or accounting team, having another person review key reconciliations and financial schedules creates an important layer of control. A simple month-end checklist that records who prepared each item, when it was completed, and who reviewed it can create useful accountability.

If these controls are only discussed once the auditor identifies a weakness, the corporation is reacting. If they are built into normal financial management, the board is exercising ongoing oversight. PAY ATTENTION TO RECURRING AUDIT ISSUES Not every audit finding is a major problem, but boards should be careful not to dismiss the same issue year after year simply because the audit was ultimately completed. If the auditor repeatedly asks for the same missing schedule, identifies the same reconciliation problem, or recommends the same internal control improvement, that is useful information. The board should understand what caused the issue, whether it has been resolved, and who is responsible for addressing it. An audit should provide more than a financial statement package for the AGM. It is also an opportunity to assess whether the systems behind those statements are working as they should. MAKE NEXT YEAR’S AUDIT EASIER NOW Once the audit is complete, boards and property managers have an opportunity that is often missed: prepare for the next one while the experience is still fresh. Document which requests took the longest to fulfill. Identify records that were difficult to locate. Review any adjusting entries or recommendations that the auditor makes and assign responsibility for necessary changes. Then, incorporate those lessons into the corporation’s monthly and year-end processes. When financial records are complete, reconciliations are current, documentation is organized, and responsibilities are clear, an audit becomes much less disruptive. More importantly, the same practices give the board better information to work with during the other eleven months of the year. Audit readiness is ultimately a by-product of good financial governance. The corporations that are best prepared when the auditors arrive have usually been paying attention all along. Harjoet Mudan is Managing Partner at Reach LLP, an Ontario-based accounting and advisory firm. He focuses on assurance, technical accuracy, and practical financial support, helping organizations strengthen financial reporting, meet regulatory requirements, and make informed decisions with greater confidence. www.reachprofessional.ca Fall 2026 |

55


OPERATIONS & MAINTENANCE

Heating & Cooling Upgrades Why the building envelope should come first.

By Ahmed Alyousif and Pierre El-Khoury

When residents complain about cold perimeter suites in January or overheating on the west side of a building in August, the mechanical system is usually the first suspect. Sometimes, that is where the problem lies. 56

| Fall 2026


OPERATIONS & MAINTENANCE

A

ging boilers, chillers, fan-coil units and controls can all directly affect comfort. However, much of the heating and cooling load the equipment must handle comes from the building envelope. That distinction matters when a condominium corporation is preparing for a major HVAC renewal. Replacing equipment without first understanding the condition of the windows, walls, roof and air barrier can lead to a system that is larger, more expensive and less effective than it needs to be. THE LOAD COMES BEFORE THE EQUIPMENT The 2025 ASHRAE Handbook — Fundamentals treats heat transfer through the enclosure, solar gain through glazing and outdoor-air infiltration as basic inputs to heating and cooling load calculations. In practical terms, engineers should determine what the building needs before deciding what equipment should serve it. A like-for-like replacement may seem straightforward, particularly when an existing system has operated for decades. Yet the original equipment may have been conservatively sized, the building may have changed, and planned enclosure work may substantially reduce future loads. New windows, better roof insulation, repaired sealants or improved air-barrier continuity can potentially revise the solution. Oversizing is not harmless. Equipment that is too large can cycle frequently, operate outside its most efficient range and provide weaker humidity control. It may also increase the initial cost of the project and, where electrification is being considered, place avoidable demand on the building’s electrical infrastructure. COMFORT COMPLAINTS TELL A STORY A thermostat does not capture everything a resident feels. A suite can meet its air-temperature setpoint and still feel uncomfortable beside cold glazing. Drafts at window perimeters can make one room feel colder than another, while afternoon solar gain can overwhelm west- or south-facing suites, even when the central cooling plant is operating normally. ASHRAE Standard 55-2023 reflects this broader view of comfort. It considers air temperature together with radiant temperature, humidity, air speed, clothing and activity. For condo boards, the practical lesson is simple: a hot-or-cold complaint is not automatically proof of an HVAC de-

ficiency. The location, time of day, orientation and weather conditions often point to the enclosure as part of the cause. That is why investigations should begin with evidence rather than assumptions. Trend data from the building automation system, suite-temperature measurements, thermography, window and wall reviews, and targeted air-leakage testing can help separate mechanical shortcomings from enclosure-related loads.

cal solution more practical and improve performance during peak winter conditions. The National Energy Code of Canada for Buildings 2020 addresses enclosure performance and HVAC efficiency within the same energy framework. Although the code’s direct application depends on the project and jurisdiction, it is a useful reminder that building energy performance is the result of connected systems, not isolated components.

PLAN THE SEQUENCE, NOT JUST THE PROJECTS Reserve fund studies typically list windows, roofs and mechanical equipment as separate assets. Residents, however, experience them as one building. The order in which those assets are renewed can have a lasting effect on cost and performance. Consider a corporation that replaces its chiller and boilers, then undertakes a major window retrofit three years later. If the new equipment was sized using the building’s pre-retrofit loads, it may be unnecessarily large once the windows are complete. The reverse can also happen: a corporation completes enclosure improvements but never revisits controls, temperature resets or operating schedules, leaving some of the expected savings on the table. Natural Resources Canada’s major energy retrofit guidelines make the same sequencing point. The guidance notes that reducing heating and cooling loads before equipment replacement may justify a smaller system and improve operating efficiency. It is a practical capital-planning principle, not an argument that every envelope project must precede every mechanical project. The right sequence depends on condition, risk and timing. A failing boiler cannot wait for a five-year window program. In that case, the design team can still model anticipated envelope improvements, consider modular or staged equipment, and preserve flexibility for future load reductions.

A BETTER QUESTION FOR THE BOARD Before approving a major HVAC replacement, the board should ask: what portion of our comfort and energy problem belongs to the equipment and what portion belongs to the building envelope? Answering that question may require a coordinated enclosure assessment, mechanical condition review and energy analysis. The objective is not to add studies for their own sake, but rather to avoid spending reserve-fund dollars on equipment sized for problems that planned building-envelope work could reduce. The most successful projects do not begin with a preferred technology. They begin with a clear understanding of how the building is performing today, what work is planned next and how each decision affects the others. That is how condo corporations turn an equipment replacement into a long-term building upgrade.

ELECTRIFICATION RAISES THE STAKES The relationship becomes even more important when a corporation is considering heat pumps or other electric heating options. A leaky, poorly insulated building needs more heating capacity and may require larger electrical upgrades. Reducing the load first can make the mechani-

Ahmed Alyousif, PhD., P.Eng., is Senior Vice President of Building Science & Resiliency at Pinchin Ltd. He leads multidisciplinary teams in building envelope, structural, mechanical, electrical and plumbing, and condition assessments. Ahmed specializes in retrofit design, capital planning, and decarbonization strategies for large building portfolios. Pierre El-Khoury, P. Eng.,is Vice President of MEP Services with our Building Science Group. He leads a team of mechanical and electrical engineers and designers. Pierre has more than 35 years of Engineering experience with public and private sector clients in Canada. He has worked and managed a wide range of MEP engineering design projects, consisting of HVAC, plumbing, electrical, and fire suppression systems as well as managed multiple portfolios of Building Condition Assessments throughout Canada and USA. Fall 2026 |

57


New & Notable

ONTARIO REFINES BROKER PENALTIES Regulatory overseers in Ontario will soon wield a new slate of fines for real estate brokerages, brokers and sales representatives who disobey the rules. The Ontario government is refining and finalizing administrative penalties that have been authorized under the provincial Trust in Real Estate Services Act (TRESA) since 2020, but not yet enacted.

severe risk of direct harm to consumers” and generally involve flouting rules that preserve the integrity of trust accounts. Those are accounts that TRESA mandates to keep clients’ funds (to be used towards real estate transactions) separate from a brokerage’s operating account.

The proposed framework has four violation categories — low, medium, high and critical — and associated fee schedules. Under the legislation, the Real Estate Council of Ontario (RECO) can impose monetary penalties of up to $25,000 at its own discretion, without need for a hearing, while affected parties have the right to appeal to the provincial Licence Appeal Tribunal within 15 days of initial notification of the penalty.

Other types of violations related to inadequate record-keeping, failure to report required information or to meet required deadlines would be classified as low or medium risk — respectively engendering first-time fines of $1,000 and $2,500, then escalating to $2,000 and $5,000 for subsequent occurrences within a 24-month period. Additionally, two high-risk violations for failing to designate or properly disclose the identity of a broker-ofrecord would merit a first-time of fine $5,000 or $10,000 for subsequent offences within a 24-month period.

As proposed in a recent consultation paper posted on Ontario’s regulatory registry, transgressors would only be liable for the maximum $25,000 fine if they committed the same critical violation for a second or further subsequent time within a 24-month period. These are defined as actions that present “a

It’s proposed that transgressors will have 30 days from notification in which to pay the fee, provided there is no appeal. Depending on the violation, a 10 per cent additional penalty could be applied for each overdue day for payment, which could potentially ratchet a fine up to the $25,000 maximum amount.

Collected fines will be used to cover the operating costs of the administrative penalty system, with excess earnings earmarked for education initiatives and public awareness. Meanwhile, that public awareness agenda includes disclosure of violators’ names and details of their penalties on RECO’s website. The consultation paper also poses questions related to potential new oversight policies and procedures for accountability within brokerages, additional rules to govern the management of trust accounts and more authority for RECO to issue orders. These are typified as “exploratory in nature” to gather input for future consideration.

Located at 420 South Service Road East, the property is the largest redevelopment parcel in midtown. The proposed Trafalgar Road Bus Rapid Transit line and regional GO bus service are planned to run through the development, with a new transit stop within the community.

OAKVILLE REIMAGINES BROWNFIELD Oakville Town Council approved the official plan and zoning amendments for a 27-acre mixeduse community on a former General Electric manufacturing site. The build-out is expected to transform underused brownfield employment lands into 5,600 homes across 14 buildings, at-grade retail, and approximately five acres of fully integrated parks and open space. 58

| Fall 2026

The project draws its inspiration from Oakville’s downtown streetscape and is designed around a network of parks, open spaces, pedestrian connections and active frontages. Features include an integrated park loop, a retail-oriented “high street,” an activated “Bentway-style” underpass, two public plazas and a timber-beam pedestrian bridge at the south end of the site providing a safe pedestrian connection over the future north-south arterial road. The first phase is expected to begin in late 2027.


Fall 2026 |

59


Condominium

|

Residential

|

Commercial

|

Rental

NADLAN-HARRIS

PROPERTY MANAGEMENT INC. Ottawa Office: 105 Champagne Ave. S. Ottawa, ON. K1S 4P3 Toronto Office: 21 Bradwick Drive, Unit 2 Concord Ontario L4K 2T4

We are a team of dedicated experts, specializing in professional property management of: • High-Rise/Low-Rise Condominiums • Residential/Commercial/Industrial • Town Home Condominiums

• New Condominium Development Consulting • Customized Community Websites • Shared Facilities • Apartment Buildings Proud members of:

Tel: 416-915-9115 Ext. 25

Fax: 416-915-9114

A S S O C I A T E

Email: info@nadlan-harris.com

www.nadlan-harris.com


Turn static files into dynamic content formats.

Create a flipbook
CondoBusiness Fall 2026 by MediaEdge - Issuu